Mostly about cycling in the
"Biking Borough"of Brent
and elsewhere in London,
but also touching on
environment, politics,
philosophy, science,
society, music and art
Showing posts with label Andrew Gilligan. Show all posts
Showing posts with label Andrew Gilligan. Show all posts
It is nearly ten months since Sadiq Khan won the London mayoral election for Labour, defeating the Conservative candidate Zac Goldsmith. As readers are likely to know, he promised to meet the demands of the London Cycling Campaign, most importantly including building more cycle Superhighways to triple the provision of segregated space on London's roads in four years, and extending the mini-Holland programme to every borough. Since then, it's all been very quiet. There was no immediate replacement for the last Cycling Commissioner, Andrew Gilligan, and, other than an announcement that the (largely back-steet and non-segregated) extension of Superhighway 6 towards St Pancras planned under Gilligan would go ahead, there have been no announcements of any definite new plans for cycling. A new bridge across the Thames from Wapping to Rotherhithe, promised by Khan during the campaign, has been mentioned by him often (along with pedestrianisation of Oxford Street, the effects of which on cycling cannot yet be predicted), but other than that, cycling affairs seem to have been in deep-freeze. Of the other two Superhighway schemes consulted on just before the election, there have been non-commital statements on CS11 to Swiss Cottage, which received public approval in the consultation and so is a scheme that was 'ready to go', while the plans for CS 10, the extension to the East-West Superhighway from Lancaster Gate to West London have vanished without trace, with not even any report on the consultation ever published.
Missing in action, presumed dead: the plans for the westwards extension of the East-West Cycle Superhighway
I've refrained from commenting on this hiatus, as the new Mayor needed time to get his feet under the desk, select his team and come up with his own strategy after assessing the results of what the last mayor had done. However, it has been deeply frustrating seeing such a successful programme apparently grind to a halt. Even the work that needed to be completed on CS 3, the East-West Superhighway from Parliament Square to Westbourne Grove that was already programmed, seemed to be taking for ever, with nothing new definitely in the pipeline. The Mayor announced a £770m budget for cycling for the next five years, but how could this possibly be spent?
So we had finally a development last week, when the new Walking and Cycling Commissioner, Will Norman, took up his post, having been appointed in November, and started making public pronouncements. When Andrew Gilligan became the first Cycling Commissioner in 2013, his views were already quite well known to cycling campaigners due to his press articles, and he had also met many of us and asked our opinions before taking up the job. Not so with Will Norman, who came on this scene as a totally unknown quantity. No-one I have met had ever heard of him before he was given the job. We were told by the Mayor that:
Will specialises in increasing levels of physical activity and participation in sports around the world, working with a range of international organisations... [including the] UN, European Parliament, G8, World Health Organisation and International Olympic Committee...
Will, who cycles every day in London, has a strong background of working with private and public partnerships, and a wealth of experience in getting people from a wide range of backgrounds active. Before joining Nike in 2013, Will set up a successful social research consultancy and was also Director of Research at The Young Foundation, where he was responsible for delivering multi-million pound European programmes and established a youth leadership organisation...
At Nike, Will has spearheaded a programme to make physical activity a global policy priority... Among his work has been a partnership with UNESCO and the German Development Agency GIZ to successfully reform physical education in South Africa, bringing activity and sports to thousands of primary school children for the first time since the 1990s.
Others who had applied for the job had been leaders in local government, campaigners, journalists, architects, planners and engineers. The choice of Will Norman was a surprising one, given a slight nebulosity of his connection to the subject in hand, that is, as I would characterise it, physically planning better walking and cycling conditions in London, and working politically to put such plans though the labyrinth of relevant controlling bodies. Still, Andrew Gilligan was perhaps no more obviously fitted to the role when he started, and yet he did achieve quite a lot.
So we were all very excited to hear that, soon after being appointed, Will would speak to a meeting at which we could attend and ask questions. Even better, he would do so with Val Shawcross, the Deputy Mayor for Transport. The meeting was part of the Street Talks programme, started by Bruce McVean and colleagues in a Holborn pub, and later taken over by Sustrans London. It took place last Wednesday at Look Mum, No Hands café. It was completely booked out, and I am sure a much larger venue could have been filled, such was the level of interest. Virtually everyone known for their interest in cycling in London was there, including Andrew Gilligan, the last commissioner, and another transport expert who many thought might get the Commissioner job, Christian Wolmar.
Such was the high level of interest in this meeting people were queueing in the street.
In a packed Look Mum, No Hands
It was apparent really from the start of this meeting there was something of a mismatch between what Shawcross and Norman had come prepared to tell their audience, and the sort of information the audience wanted. The audience was a group of campaigners for walking and cycling. There was no need to explain to them the myriad social, economic and health benefits of getting more walking and cycling in cities. They had also mostly heard the vague talk of 'Healthy Streets' emanating recently from Transport for London spokespeople, and probably seen the cheerful-looking slides before. They wanted details. They wanted to know what this administration would actually do on the ground. They wanted to know why key projects the last Mayor had proposed, CS 10 and CS 11, were stalled, and what would come next. They wanted to know how the new mini-Holland programme (re-christened 'Heathy Town Centres') would look, and be rolled out, and what would happen to the largely failed Quietways programme. They did not get this information, and there was an increasing level of frustration palpable at being given 'motherhood and apple pie' recipes for the healthy city of the future. As Mark Treasure tweeted about 30 minutes into the meeting:
So far I've learned that cycling and walking is healthy and it would be good if more people walked and cycled #streettalks
The Healthy Streets slide you've probably seen before
The chair seemed to believe there would be some sort of debate in the room about the basic desirability of changing the city to enable higher levels of cycling and walking, which showed how out-of-place he was. (Apparently he was an employee of 'The Prince's Trust, whatever that is). It may be worth recalling that the first time Andrew Gilligan had addressed the public after his appointment, he already had a quite specific 'Vision' document he had written with the Mayor to show campaigners, and he was announcing brand-new and highly-ambitious schemes, such as 'Crossrail for the Bike' (which became CS3, and got built), a 'Bike Grid for Central London' (which did not really happen), better Superhighways (which happened at CS3, CS5 and CS6, but not CS1), a 'Jubilee Line Route' from the West End to Wembley (which did not happen), and 'Mini-Hollands in the suburbs" – three of which happened, though only one of which, the Waltham Forest one, is yet really impressive. So compared to all this promise in 2013, the Shawcross-Norman act at Look Mum, No Hands in 2017 was insubstantial indeed.
I asked Will Norman for some details. What schemes would he be bringing forward first? He said he wouldn't make announcements on the programme, as the was going to be a process of analysing where the most demand was in order to prioritise the next phase of cycle network development. He was prepared to say that CS 4 and CS 9 would be consulted on this year. This means that construction on those could begin in 2018. (It is widely believed that CS 9, an East-West Superhighway running through Houslow and Ealing, and Hammersmith & Fulham, will just have to stop at the boundary of Kensington & Chelsea, as the Royal Borough won't allow Cycle Superhighways on its streets.)
The sharpest interest from the audience was on the future of CS 11 and its proposed associated part-time gate closures at Regent's Park. A question on this received the reply from Val Shawcross that Regent's Park was a dangerous place for pedestrians, and so the solution for the Superhighway needed to take this into account. So, you would have thought, she would be jumping at the opportunity to remove rush-hour through-traffic from the park by selectively closing gates. But, no, bafflingly, she uttered these words:
Gate closures will happen if that's what we need to do, but we are looking at alternatives for a safer park.
What could that possibly mean? It seemed that she was considering a segregated track for cyclists. Now, I am one of the world's leading supporters of segregated cycle tracks, as the whole of this blog testifies, but I can't really see how one on the Outer Circle of Regent's Park would solve the problems there. It might reduce traffic speeds slightly, by restricting space for motor traffic, but it would not reduce traffic volume in the park as closing gates selectively would. Of itself it would not facilitate pedestrians crossing the roads. It would not provide the space that the sports cyclists need for their circuits; it would be a disaster for them, as they would be squeezed on to the narrowed road space. The only way to make a track wide enough to cater for utility, commuting and sports cyclists of all types would be to make it the width of the whole road (minus the car parking) – in other words, to go back to the idea of having an unsegregated road, with no through motor traffic on it.
The consulted plan for CS 11 with the proposed part-time gate-closures
No-one campaigning for the implementation of CS 11 wants a cycle track solution in the park. The suggestion of it by Shawcross now might even be seen as a cynical attempt to split the pro-CS 11 lobby by driving a wedge between the utility cyclists, who would benefit from the track, and the sports cyclists, who would disbenefit. A track would do nothing for the pollution levels in the park, which would continue to be a taxi rat-run. Without the closure of Macclesfield Gate, there will still be too much traffic on Avenue Road between Swiss Cottage and the park for it to act as a safe or inclusive Cycle Superhighway. The whole scheme will be ruined. A cycle track on the Outer Circle is a non-starter. Why is Shawcross raising this possibility at all? Why not just get on with the already consulted plan? It makes no sense to say that the safety of park users is a top priority, and then keep the Outer Circle open as a rush-hour rat-run.
Other questions came on development issues such as the Olympic Park, where the cycle infrastructure built on this blank slate site has been highly disappointing, and Old Oak Common, which is another stalled mayoral development project. Again there were no details forthcoming. I don't suppose Norman has had time to look at any of this yet, so it is not surprising. But what I might have expected, reasonably, I think, from him and Shawcross was some more strategic indication of where they would be going in relationship to how cycling had been left by the last administration. What did they think of the facilities that have been built? What did they think had worked, what had failed, and why? What should be improved, what, specifically, are the next steps in making 'London a by-word for cycling', as Sadiq Khan has promised? We really didn't get this. We did get a statement from Shawcross that the Santander hire scheme (AKA Boris Bikes) would not be expanded, as it is too expensive to do so. We didn't get any commitment to review the rather modest target of achieving 1.5 million cycle journeys a day by 2021.
There were some stranger thing in the meeting. One questioner referred to the high-pollution days we have been experiencing in London, and asked, 'Rather than tell people not to go out and take exercise, why can't you tell people not to drive instead?' All the audience understood what this was about, having seen tweets along these lines from TfL, and applauded the question. But Shawcross bizarrely misunderstood, despite lots of people trying to should out to explain it to her. This was a question about messaging, but she interpreted as a question about closing roads locally, or more widely, for 'car free days'. She seemed to be quite against these, cv claiming that 'the science is not behind' trying to reduce pollution by closing roads. There was a ruckus. There was more disbelief in the audience when it transpired that the Chair didn't know what mini-hollands were. It was like being at a debate on medical ethics where the chair had never heard of stem cell research, or something like that.
Shawcross and Norman merely putting to the meeting a broad view on making streets better for cycling and walking, without any firm proposals for particular locations, might have been seen as fair enough, except that the problem was (and I have Shawcross more in my sights here than Norman, as she has been in post for much longer, and is an experienced politician) that they were talking as if they were starting from nothing, as if the last administration had not also had strategy on these things, and had not done quite a bit of good. They were not acknowledging this. They were talking as if an active travel agenda had to be created for the first time ever, and not as if the main issues had been gone into already, and many problems found, particularly with realising such a vision with the fragmentation of authority between the Mayor, the boroughs, the Corporation, the Royal Parks, the Canal and River Trust, other bodies, and opposition from powerful versed groups. They were not telling us how they hoped the new administration might overcome issues that the old one could not, such as the blockages caused by the critically-placed anti-cycling councils in Westminster and Kensington & Chelsea.
I had already asked Val Shawcross about CS10, the extension west of the E-W Superhighway, at a meeting last year. She had said then that TfL were 'looking at different options to decide a way forward'. We all know however there are no options other than the plan which was consulted on, to create a cycle track on the elevated Westway, as all the other roads west out of central London are, at least in part, controlled by the Royal Borough of Kensington & Chelsea. We got no more information on this, leading one to suspect she and TfL have no more clue about it. The Superhighway has now been built as far as Westbourne Terrace. This is where it was meant to join the Westway. It is now just going to end at the huge, awful junction of the A40 and Harrow Road, where cyclists will have n-where further to go. I am genuinely fearful about this. The Superhighway from the parks will attract many hire-bikes and tourists, who will end up at this point and be abandoned. I really fear bad things will happen at the end of the Superhighway at Westbourne Terrace. Coming up with no solution here is a dereliction of duty on the part of Sadiq Khan and Val Shawcross.
The existing plan for CS3 and CS10, the E-W Superhighway. It now ends in Westbourne Terrace
Nice new cycle tracks in Hyde Park will now deliver cyclists like this...
...to here, Westbourne Bridge, where the Superhighway should have gone on to the flyover, but now will just run out.
Will Norman, from my first brief engagement with him, came across as personable and able to talk to a crowd. He seemed like a nice guy, but I wonder if he knows what he's got himself into. I am worried he could become a fall-guy, the person angry meetings, of similar composition to the meeting at Look Mum, No Hands, shout at over the next three years at as the Mayor fails to deliver on his cycling promises, but who lacks the influence or political heft to do anything about it. The huge advantage that Andrew Gilligan had was that Boris Johnson did back him, and never undermined him, never put him out front to take the flack for decisions he wan't responsible for.
The Heathy Streets agenda that Shawcross and Norman were promoting sounds good in theory, but how will it collide with the political reality of the opposition they will get to any attempts at reallocating space on the roads or changing the functions of roads, demonstrated so clearly by the totally unreasonable opposition to CS 11 and the Regent's Park gate closures, and the numerous failed Quietway schemes around London, where councils didn't believe their residents would support the closing of streets to through motor traffic? It sounds as if the Healthy Streets initiative could easily descend into a programme of uncontroversial prettification. We could easily get the benches, more trees, nice paving, a few extra crossings, and no reduction in motor traffic, and no more high-quality space for cycling. Sadiq Khan has made a much bigger 'thing' than his predecessor of tacking the life-threatening air pollution we suffer from in London, in his speeches, at least. But what has he actually announced after 10 months in the job? He has announced a higher rate of congestion charge on a rather small number of the most polluting cars entering the very small area of the central charging zone. The response so far has not been in proportion to the problem, or the rhetoric, and Shawcross's comments on the undesirability of closing roads as 'Not supported by science' indicates such 'big talking' coupled with political timidity is likely to be the pattern for this administration.
The Quietway routes promised three years ago: only Waterloo to Greenwich has happened in any meaningful sense.
A change from the previous Mayor's policies would be, Shawcross told us at the Look Mum, No Hands meeting, that there would henceforth be a 'hierarchy' of consideration for the streets. Pedestrians would be at the top of this, followed by people on bikes, followed by bus users, followed by taxi users, with private motorists last. I'm afraid I'm not impressed with this talk. I've been listening for a quarter of a century to statements along the line of 'It is the policy of the London borough of Brokenham to priorities the need to pedestrians and cyclists above those of motor traffic'. These empty 'hierarchy' promises are easy to make to rooms full of active travel experts and enthusiasts, and always have been, they but don't often translate into reality in terms of space and junction time allocated on the streets for pedestrians and cyclists. They don't prevent you having to press a button and then wait two minutes before you can cross the road, and they don't prevent cycle lanes being ruled impossible due to a 'need' for parking. In practice, for nearly every real decision about priorities on the streets taken in authorities which have these stated hierarchies, the hierarchy, when it meets other, sharper political realities, suddenly gives way to a need to 'take into account and balance the needs of all road-users'.
I am told, and someone can correct me if it is not true, that there is a room in Transport for London's headquarters (or maybe in City Hall), somewhere at the top of the building, were there are lots of screens and lots of controls. This is the traffic control neve-centre for London. For TfL controlled roads, operators are monitoring traffic and queues, and they are trying to optimise traffic flow. This means the flow of motor traffic, not the flow or pedestrians or cyclists. They are making adjustments to signal timing all the time to try to keep the motor traffic flowing. They are reducing timings for pedestrian crossings where they feel it is necessary to reduce queues of motor traffic. They are explicitly prioritising cars over people. If all this is true, then I expect Shawcross and Norman to go to these people, and tell them, in future, they are going to have to do something different. If they don't, or can't, I am afraid I think we are being told fairy stories about this Mayor's approach to transport.
Construction of the East-West Cycle Superhighway (or CS3) in London has been continuing, and the sections on the roads in Hyde Park are nearly built, and to pleasing quality.
From the already-famous section on the Embankment, which opened on 6 May (the opening was Boris Johnson's last act as Mayor of London) the route is programmed to go via Bridge Street, Parliament Square and George Street (already constructed) via a new path on Birdcage Walk by St James's Park, a new bollard-segregated section past Buckingham Palace (mentioned in this post), and an upgraded path along the margin of Green Park in Constitution Hill, to the crossing of Hyde Park Corner, and thence along South Carriage Drive in Hyde Park. It will then turn sharply north on to West Carriage Drive (wrongly labelled as 'Exhibition Road' in TfL's own diagram, below) and exit the park at Lancaster Gate.
As I've pointed out before, this routing is not the most logical, and I expect most cyclists actually following the east-west route to connect from Apsley Gate at Hyde Park Corner to Lancaster Gate via the existing cycle path of the Broad Walk and the North Carriage Drive, which is more direct than the official route, which seems to have been chosen for political reasons between the Royal Parks Authority and Transport for London. I guess they did not want to 'encourage' more cyclists on to the already busy Broad Walk, full of pedestrians, cyclists and skateboarders, which has painted-line segregation and a poor design which is not effective at keeping pedestrians and cyclists apart. (One foolishness is that the benches must be accessed from the footpath by crossing the cycle path – it would be better to use the benches as a barrier.)
Rather than change this poor design in Broad Walk, the authorities have chosen to built a new high-quality route along the South and West Carriage Drives (which already had cycle facilities, but poor ones). This is in many ways a good thing. It creates a high-quality, high-capacity motor-traffic-free connection from Hyde Park Corner to Kensington Gardens and South Kensington (Exhibition Road) to replace the far too narrow, existing line-segregated path along the south side of the park. At the same time it benefits walkers, taming the rat-run of South Carriage Drive and taking flows of cyclists on the east-west axis well away from flows of pedestrians. The work on West Carriage Drive is also, in itself, welcome and long-overdue, replacing the strange and illogical mixture on on and off-road 'facilities' on different sides of the road that existed before, and creating a top-quality cycle connection north-south across the park from Exhibition Road to Westbourne Terrace, linking South Kensington to the future western extension of the Superhighway.
Boris Johnson opens the first phase of the East-West Superhighway in May
Two-way Superhighway on the west side of Bridge Street, heading for signals in Parliament Square
The old cycle path on Broad Walk does not effectively keep pedestrians out at busy times, and is often closed for events.
South Carriage Drive as it was: a wide, open fast rat run for cars with a painted cycle line that only hardened cyclists dared use, and space-wasting central islands that forced pedestrians to cross the road in two stages
Building work on South Carriage Drive in early July. A swathe of road on the park side is being segregated off for a 4m wide track. The old pedestrian islands are going, along with the old cycle lane, and the whole road is being moved southwards (to the right) slightly.
A completed section of 4m segregation on South Carriage Drive near Hyde Park Corner. The old cycle lane markings are still present and the red surface is old. Presumably it will be resurfaced.
The track on the east side of the West Carriage Drive is largely complete and is 4m wide generally but widens to 6m at Alexandra Gate to allow for lanes for cyclists heading to and from Exhibition Road and cyclists following the Superhighway from and to South Carriage Drive.
Charlie Fernandes (@Charliecycling) demonstrates the width of the track approaching Alexandra Gate (Exhibition Road). The pavement has been rebuilt and the old, poor on-pavement cycle track is gone.
The track in West Carriage Drive gracefully allows cyclists to bypass the near-permanent traffic jam that has always made cycling here so unpleasant and inefficient in the past
A chamfered kerb has been used here, which is good practice, and in the distance a table runs across both cycle track and carriageway at a pedestrian crossing point.
Detail of the speed table on the track. The ramp has cobble-ish stones but is fairly benign. I don't know why a zebra crossing was not used; are Royal Parks are antipathetic to these?
The track becomes very wide again on the curve north of the Serpentine Bridge. This is very good design; there is something of a slope here and some cyclists will be going fast at the junction of the track with the car park entrance: the extra width here gives room for errors by both drivers and cyclists
The same viewed from the north. An odd thing has occurred her in the cycle track having a black machine-laid surface, but the carriageway being reddish, as is often Royal Park's practice. The colours are thus the reverse of the Dutch convention.
When I viewed these facilities in early July they were not yet open, though of course cyclists were trying to use them. The building of the linkage through Lancaster Gate, a hitherto highly unpleasant racetrack gyratory and major blockage on the cycle network, had not started. I believe work in Westbourne Terrace, further north, has started, however. This is the last part of the Superhighway that is currently approved for construction. In April consultation took place on the next section, taking CS3 (and the Superhighways) firmly into West London, via the elevated Westway section of the A40. This idea, by Johnson's cycling commissioner, Andrew Gilligan, was not universally welcomed by cycle campaigners, who generally would have preferred a more accessible and humane route on the surface, but I supported it, as, due to the obstructiveness of the Royal Borough of Kensington and Chelsea, who seem to have a horror of the idea of cycle tracks on their roads, there was really no alternative for westwards continuation at that time. Transport for London have jurisdiction over the A40.
We await a decision by the new Mayor Sadiq Khan on the continuation of CS3 on the Westway, as well as the northward continuation of CS6, the North-South Superhighway, from Farringdon Road to Judd Street, and the commencement of works on CS11 from Portland Place to Swiss Cottage. All these were consulted on earlier this year, and, despite the vicious campaign against CS11 that I reported on, all secured a high level of public support. Khan must now start to make good his election promise to 'Make London a byword for cycling'. So far we have only heard generalities from him (except for a commitment to create a new walking and cycling bridge in East London and a commitment to pedestrianise Oxford Street, which may or may not work out well for cycling). He has also not yet appointed a successor to the highly-successful first Cycling Commissioner for London, Andrew Gilligan. Caroline Russell, Green London Assembly Member, has reported that this job, which is to be re-badged as 'Cycling and Walking Commissioner', is to be advertised soon. I am worried about this.
The Cycling Commissioner post that Gilligan occupied under Johnson was a political post, as it needed to be. The job was not advertised because it needed to go to a political ally of the Mayor for the role to be effectively accomplished. In, Gilligan, an ally of Johnson, and indeed a friend, political heft was combined with diplomatic capability and a great deal of knowledge about cycling in London, with a recognition of it as being generally dreadful, and a determination to knock political and bureaucratic heads together in order to change things. A journalist, and thus an expert at publicity or propaganda, Gilligan was not a technical expert but understood enough technicalities to challenge experts when they stood in the way of progress, and was able to work with campaigners, if not always in complete harmony, then with a constructive friction; a kind of double-agent if you will.
Advertising the post of Cycling and Walking Commissioner suggests it is to be be downgraded to a technical role. A technician is likely to be ineffective in this highly political position. But we will have to see; I hope my worries on this are unfounded. They could be, with someone who is an expert in the post of Commissioner, but a strong driving force from the Mayor and Deputy Mayor for Transport. I suppose Gilligan could re-apply for the job; he is clearly the most qualified person to do it. His report on the progress of the first three years of The Mayor's Vision for Cycling, Human Streets, is worth a read.
While the segregated Superhighways have been the massive success we knew they would be, they are still far from where most Londoners live and work. They only represent the bare beginnings of a functioning cycle network. It would be a crime for momentum to be lost and for the the expertise now built up within Transport for London in building high-quality, effective cycle infrastructure to be dissipated, which is what will occur if we do not rapidly have a plan for expansion of the network, in all directions, beyond Zone 1. Khan has popular, fully developed 'shovel-ready' schemes at his fingertips in CS3 as far as Wood Lane, CS6 as far as Euston Road and CS11 as far as Swiss Cottage. He needs to approve these now, get his Commissioner in place, and produce the detailed plan for the next four years.
He has been busy, of course, with the EU referendum, and, in the aftermath, with pressing the government for new powers to allow him to keep London as closely linked to Europe as possible; these were the right things for him to be doing, and the strategic and financing powers he is seeking, if he is successful, can only be good for continuation of the cycling programme and modernisation of the streets generally. In particular, he needs far more authority over the infrastructure currently controlled by the boroughs, the Corporation of the City of London, and the Royal Parks. The lack of this authority is pointed to in Gilligan's report as a major reason why progress on the Mayor's Vision has not been faster. Nevertheless, Khan should not repeat Johnson's mistake of moving slowly, being in office for eight (or four) years, and scrambling to try to build a world-class cycle network in the last few months of that.
This post will not be the one that you thought it would be from the title. The title was suggested to me by a tweet from @AlternativeDfT whose inspiration I hereby acknowledge. Here is is:
THIS is what real "taking the lane" looks like, not some temporary mirage dependent on a driver's temperament. Taken for good!
He's referring to this picture of the very first cyclists to use the East-West Cycle Superhighway currently under construction on the Thames Embankment in London.
I was originally going write a kind of review post called Reflections on reaching 500,000, marking the half million page views of this blog, but we have gone a bit beyond that now. I have not had time to comment on many of the recent developments on cycling in London, but I thought I would try to summarise the state of play now as I see it, how far we have come, how we got there, and where we are going: a big task, necessitating an unusually long post. The account will be, of necessity, quite personal. The quote from @AlternativeDfT contains, of course, an ironic reference to the technique of 'vehicular cycling' as taught in various manuals, but that won't actually concern me here. The picture of the East-West Superhighway in action at last, combined with @AlternativeDfT's concept of Taking the lane – for good rather summarises all I have been trying to achieve in over 20 years of cycle campaigning in London, hence the title. This blogpost is a kind of summary of the whole blog so far, over five years.
Camden experiments and the early London Cycle Network
My main campaigning objective, as you will probably know if you have read earlier posts, has always been to get London to build a world-class network of segregated and largely-car free cycle infrastructure that will enable mass utility cycling. I became convinced that this was the correct direction in which to go in the late 1990s, mostly through discussions with Paul Gannon in the Camden Cycling Campaign, a branch of London Cycling Campaign.
Our successes in CCC in that period were the construction of the Royal College Street segregated cycle track (the first one), and the east-west cycle track through Bloomsbury, as I have described before. These were early examples of taking the lane, in the sense of my (@AlternativeDfT's) title. We got Camden council to remove lanes dedicated to motor traffic on the road, and just give them to cyclists. This was a big step forward from previous London Cycle Network concepts of painting lanes on the road that drivers could still physically drive on and park in, or confusingly painting cycle symbols on largely unadjusted bits of pavement, which was, and tragically, still remains, one of the government's (the Department for Transport's) main recommendations to local authorities for cycle infrastructure.
The original Royal College Street cycle track in Camden, photographed soon after it was built in 2000
I authored a piece in the LCC magazine, London Cyclist, with Paul Gannon,published in the October 2002 edition (you can read it here), in which we went through the whole argument about the need for high-quality segregated cycle routes to change the reality and perception of safety of cycling in London and readjust the demographic balance of cyclists to make it more like that found in the Netherlands and Scandinavian countries in order to make high levels of utility cycling (which I would define as a modal share of all trips above 10%) a practical possibility. We used graphs, figures and international comparisons, and we showed pictures of good and bad segregated cycling schemes in London, pointing out the errors that cause failure of some schemes. We also discussed the need for more and better training of cyclists, that would need to take into account the skills required for using a proper cycle network in a city of mass cycling (not just teach cyclists how to defend themselves against drivers on the roads), and the need for changes to the UK legal framework to balance it more in favour of the rights of vulnerable road users. But we were rather clear that the most productive thing campaigners could do at that moment was to campaign for more high-quality segregated cycle tracks on the roads. The key to the problem was taking the lane.
This was all pretty revolutionary stuff at the time; though not novel – other authors, notably academics like John Parkin, had written similar things before, but it was unusual find these ideas advocated in grass-roots cycle campaigning at that time, I don't think any other article had every been published on similar lines in London Cyclist (which had been published since the 1980s), and such view were very widely attacked by other campaigners. Nevertheless, it was all an extension of other developments that had already been occurring: some moves, from as early as the1980s, to establish a London Cycle Network that would, as David Hembrow would now say, unravel cycle journeys from busy motor routes in London. We can see some of these early attempts in a classic film now on YouTube: GLC Cycling for Londonfrom 1984 shows examples of cycle crossings of main roads, no-entries with exceptions for bikes and other early attempts to allow cyclists to thread a path through relatively traffic-free minor roads that was not possible for motor vehicles. Interestingly, many of these facilities still exist today, virtually unaltered, including the so-calle Ambassadors Route, which is shown. It has long ceased to be known by that name, but still runs from Albert Gate in Hyde Park to Chelsea Bridge.
These early network attempts were pretty limited because they tended to run out of ideas in the many places in London where main routes could not be avoided, particularly on and approaching crossings of the Thames and other barriers, they did not deal with major junctions very much nor physically reallocate any space on crucial main roads, they were built to low capacity standards, and they were sparse, soon exhausting the practical possibilities for running useful cycle routes entirely on the network of back-streets. Nevertheless, by the early 2000s, despite the slowdown in building them caused by the abolition of the Greater London Council (which produced the film), but because of the persistence of local campaigners, like us in CCC, trying to improve standards and ambition from the various borough councils that took over responsibility for the cycle network from the GLC, they had certainly made an impact. Cycling in London was on the rise, reversing the downward trend of the post-war period up to the 1980s, and in the same issue of London Cyclist that I already mentioned, October 2002, in which Paul's and my article appeared, we find this letter to the editor, which I urge you to read in full.
Well, perhaps it's a bit overstated, but I find this quite moving, coming as it does in the same issue in which Paul and I laid out the rationale of the segregated tracks we had been developing, and which Mike Aitken had already discovered and been so pleased by, and to me it's an important piece of evidence as well. It coincides with my view that the beginnings of a cycle network that had been developed in London by 2002 were actually effective in promoting journeys by bike, particularly in central London – even poor cycle facilities do have some positive effect – and it opposes the view that I have often heard stated, particularly by Roger Geffen, policy officer for CTC, that the moderm upsurge in cycling in London was independent of any provision, and particularly occurred without the provision of segregated space. I hold it did not. Segregated space and almost car-free space as part of the network was developed from the 1980s onwards, mostly by allowing cycling in the parks, on bits of embankment and towpaths, by providing cycle-specific connections which allowed these spaces to be utilised and accessed from the road network, and by means of minor road routes facilitated by the types of means shown in the GLA video and referred to in the letter.
This, remember, was the period before the congestion charge, and a period when Inner London was still depopulating, and an increase in cycling could not be attributed to increasing population density. Counts of cycles on screen lines provide the most accurate figures for cycling, and the data shows that cycling into central London was on a clear upward trend from the mid 1990s, and into inner London, increasing from 2002. The early, poor London Cycle Network did actually, to an extent, work, and our work in adding into it the first substantial, properly segregated on-road routes in Camden (which got extended a bit into Islington as well, but sadly not Westminster) enhanced it considerably, though only very locally, so you would be lucky to find yourself, like Mike Aitken, in the position where the new routes helped your commute.
I went into, in my earlier article, why the Bloomsbury route never achieved its potential, as it was compromised and mis-constructed into a space half the desired size. Basically, in this period, few politicians, and perhaps even fewer cycle campaigners, believed there was actually any demand for cycle routes like this. There was a belief that they would not be used much, and certainly they would not fill up. Paul and I were not surprised, but virtually everyone else was, that the Bloomsbury route was full to capacity from the day it opened, and remains so today.
We fondly hoped that such immediate success, and particularly with a route in quite an 'iconic' location, known to many Londoners, by the University of London and Dillons (now Waterstones) University Bookshop, the concept would rapidly spread, and other boroughs would build similar routes. But things are never quite as simple or as easy as this. Lack of borough resources no doubt played a part, in the era before the GLA and TfL were established, and lack of coordination between the boroughs and relevant leadership within them, but certainly a factor was the continued division amongst cyclists, within the LCC and CTC, and local groups, as to the in principle desirability of segregating cyclists from motor traffic. To say this today will sound strange to many, but the poor quality of information available at that time, in this largely pre-internet age, and climate of misinformation, spread by the likes of the American author John Forester, and his UK equivalent John Franklin, about the nature and results of segregated cycling systems across the world, which was widely manifested in what Paul Gannon has described as a counter-evidential 'campaigners' groupthink' within cycling organisations, where you wouldn't really be accepted socially unless you toed a certain philosophical line – the integrationist, pro vehicular cycling line according to the gospel of Frankin and Forester – resulted in it being very difficult for those cyclists (probably always a quiet majority), who felt instinctively that what the wide public really needed and wanted was to be able to cycle in a motor-free environment, to express that view wihout being shouted down, demeaned, or told they were ignorant of all the 'facts' and 'research'.
A period of stasis and ineffective campaigning
So history moved on. Tony Blair gave London a government again in 2000, and Ken Livingstone, previously leader of the Greater London Council, which had begun the London cycle Network in the 1980s, became Mayor. But Livingstone, a non-cyclist and bus enthusiast, never understood cycling, and his re-warmed cycling programme, called LCN+, soon ran into the sand, not being not based on the type of understanding we had been trying to promote in Camden for the need for demographically inclusive cycle facilities, nor backed by the political will to tackle the difficult places, the big, unavoidable roads and junctions, ther Niagaras and vortexes, in Mike Aitken's terms, that remained huge barriers everywhere, in places like Elephant and Castle, Swiss Cottage, Kings Cross, Bank and Bow. The concept in LCN+ was still one of basically trying to connect up backstreets, but, as I said, the easy possibilities for this had really been exhausted already in the first LCN building phase. Far more significant were other things that happened in this period: the introduction of the Central London congestion charge in 2003 caused a massive transfer of private car journeys directly to the bike, as the graph above shows. Ken's enthusiastic extension of the bus lanes (shared with cyclists) no doubt helped a bit for cycle commuters travelling at peak hours when the lanes were in operation and free from parked cars (though junctions remained dangerous). The 7 July 2005 bombings of the tube and bus network also seemed to cause some people to start cycling as a permanent lifestyle change, and the changing demographics of London, with an inflight to the inner city, reversing decades of exodus, probably enhanced the trend.
It was clear by the end of Ken's period in office, 2008, that a change of direction was needed if any cycle growth momentum was to be sustained, and the new Mayor, Boris Johnson, who was a cyclist, proposed the Cycle Superhighway project to replace an abandoned LCN+: a 'network' or twelve radial routes into central London from the suburbs, mostly on major roads controlled by the Mayor's transport organisation, TfL, not by the boroughs. I put the word 'network' in quotes, as it was not a network, the routes failing to link up in the centre. Moreover, the whole conception of the routes was, as I commented at the time, 'calamitously inadequate to the task', with little segregation, routes largely using busy bus lanes, and parked on much of the time, and lethal junctions. (Literally lethal junctions, as people soon started to get killed on Superhighway 2). Unfortunately the LCC went through a period, at this time, of ineffectual campaigning and weak leadership, with a chief executive, Koy Thomson, who believed in not criticising the authorities too much for fear of being excluded from influence and negotiations, and having no desire to take the membership on to the streets and protest, or otherwise be seen to be 'too militant'.
The defective design of the Cycle Superhighway at Bow that resulted in three deaths
There was also the issue in the background that LCC, and even more so CTC, had never grappled with the segregation issue. They did not really know what they wanted as organisations, in terms of policy for accommodating cyclists in the transport network, at a very fundamental level, so couldn't argue for any coherent alternative to mis-concepts like the first generation cycle superhighways. There was a fear of confronting the division that existed, which resulted in a kind of paralysis. Also, there was the concept of not 'dangerising' cycling, which was highly prevalent, and generally corresponded with an anti-segregation stance. We couldn't campaign for safe facilities because we couldn't talk about the danger that existed, for fear of putting off new cyclists, which was believed to be counterproductive, since it was felt that there was 'safety in numbers' rather than in properly-designed infrastructure. These beliefs came very directly out of the Franklin-Forester 'religion'. I've taken on this belief-system in this blog several times, and a nice recent article by As EasyAs Riding A Bike does a good job (again) of demolishing this nonsense. But at one stage in Koy Thomson's LCC, campaigners were actually told not 'to use the D word' in their public pronouncements!
Enlightenment
But times they were a-changin'. The dark ages of the lack of information about how segregated cycling actually worked in the Netherlands, Denmark and so on were being swept away by blogs like and A View From the Cycle Path, Copenhagenize and others you can see in the sidebar of this blog. Home-grown London blogs like Crap Cycling and Walking in Waltham Forest, Cyclists in the City and iBikeLondon proved a significant force to mobilise a new movement, and the Cycling Embassy of Great Britain was formed to spread information about good and effective cycle engineering practice in the UK, and campaign for its implementation nationally. A new, dynamic CEO of LCC, Ashok Sinha, decided that the organisation needed to organise big, clearly directed campaigns, involving mass protests on the streets, as well as lobbying all the levers of power. The Tour de Danger, breaking the taboo on 'the D word', around all the worst junctions in London, was one of the first of these mass protest rides, organised initially by bloggers, and then endorsed by LCC, who did organise the string of protests at Blackfriars, covered in early posts on this blog. Also, significantly 2011, Sinha decided to consult the LCC members, the ordinary cyclists of London, directly, on what they actually wanted the organisation to campaign for in the run-up to the mayoral election of 2012. I proposed that they should be asked whether they wanted to campaign for segregated cycle routes like the Camden ones, for more taking the lane. As I expected, they massively concurred.
The Big Ride organised by LCC to promote its Love London, Go Dutch demands before the May 2012 mayoral election
This campaign was styled under the slogan Love London, Go Dutch, and a set of demands was put together and promoted in 2012 in a manner that made it very clear to the candidates for mayor that London's cyclists were a substantial, committed and united lobby who were demanding space to be taken from motor vehicles on main roads and physically reallocated to cycling, primarily for the benefit of the vast number of people who could cycle, but refused to do so under existing conditions. So successful was the campaign that all the mainstream candidates signed up to the demands, though I was sceptical about the true commitment of Boris Johnson to the programme. After his re-election (very marginal, in which the votes of cyclists could have made difference), things moved slowly, and there was talk of a new programme and a new person to take on a job as the Mayor's Cycling Commissioner, but little apparent action through the remainder of 2012. In October of that year I met the journalist Andrew Gilligan at a conference on Love London, Go Dutch organised by LCC and the Dutch Embassy with participation from TfL and the DfT. He asked my opinions and I emphasised to him the need for high-profile, effective segregated cycle tracks on London's main roads. I think he was already convinced of the case for this. When asked what was the one scheme that could make the biggest difference, I said the most obvious and easiest 'big win' was a segregated route along the north side of the Thames, on the Embankment. I may not have been the first to suggest this to him, but I can thus possibly claim some parentage to the East-West Superhighway.
Three months later, in January 2013 it transpired that Gilligan was the Mayor's Cycling Commissioner. In March he produced The Mayor's Vision for Cycling in London document that made promises pleasingly close to the Love, London, Go Dutch campaign demands. Critically, the Cycle Superhighways were to be upgraded and re-planned to the standards demanded, with large-scale segregation, and a grid of routes in central London was to be created to connect them up. The healine scheme was to be the route on the Embankment that I had suggested, styled Crossrail for the Bike extended east and west from Barking to 'the western suburbs'. So clearly the Camden-pioneered programme of Taking the lane had been re-started after a decade and a half of delay.
At its October 2013 AGM, LCC further solidified its policy on physical provision for bikes, mostly through the efforts of its dynamic new Board member and Chair of its Policy Forum, sociologist of transport Rachel Aldred. The elected Policy Forum had been established at the initiative of Ashok Sinha a year earlier, to sort out the thorny issues I have dwelt upon above, but it had been initially chaired by Hackney anti-segregationist Oliver Schick, so had made no progress. Influenced by the Dutch standards being promoted by the Cycling Embassy of Great Britain, the Policy Forum now proposed to the Campaign that the bar for segregation to be demanded on cycle routes was to be set at 2,000 vehicles per day and 20mph. The AGM accepted this policy proposal, along with another from me on Uniformity of Provision, designed to put an end to two-tier network thinking and official discrimination that traditionally operated through providing for different notional 'types' of cyclists differently, so setting-up unacceptable choices between safety and convenience.
Proper standards and gradualist change
The new standards LCC adopted in 2013 meant that without speeds of 20 or lower plus very low motor vehicle volumes (generally only attainable on roads closed to through motor traffic), the campaign would henceforth not except as adequate route implementations those which were not physically segregated by some means or another. This was, at last, the clear and definitive endorsement of the policy I had been seeking since before 2000. The long internal arguments were over (in LCC, if not in the national organisations CTC and Cyclenation), and we could campaign unequivocally for what we needed for inclusive mass cycling. One novel means of segregation was being experimented with in Camden, where the Royal College Street track was rebuilt in 2013 with lightweight segregation on both sides of the road, to allow a capacity increase of at least 33%. This was another significant bit of taking the lane. Hard to recall now, but before 2000, Royal College Street was a three-lane one-way motor racetrack. In 2000 we took one lane from the cars, and in 2013 we took another. It is now one lane for cars, still one-way, but transformed out of all recognition from 15 years ago: a testament to, and a proof of the effectiveness of, visionary, but gradualist, campaigning.
The Royal College Street light segregation rebuild in 2013
LCC launched a further big campaign for the 2014 local elections in London entitled Space for Cycling. This was based on the polices adopted in 2013, and the idea spread to other parts of the country, with CTC and Cyclenation endorsing a national campaign along the same lines. So now the cycle lobby nationally was asking protected space on main roads and through major junctions, another landmark whose significance will be appreciated only a few people who have been involved with this over a long period. To those who became involved only more recently, it will just seem reasonable and expected. Back in London, it was satisfying to the the designs produced in September 2014 for the East-West Superhighway (as Crossrail for the Bike was subsequently renamed) and North-South Superhighway as being pretty much as ambitions as I would have liked them to be. We were to get, at long last, after all the protests, segregated cycling on Blackfriars bridge, a huge amount of motor traffic space was to be removed in the Blackfriars area to be given to the intersection of the two flagship segregated routes ('shockingly different' was how Cyclists in the City described the visualisation of this), and a high-capacity segregated route was to be driven right through that horrible gyratory Parliament Square and past the Houses of Parliament themselves. If we had believed in Camden in 2000 that our Bloomsbury route was a high-profile one, that would achieve a step-change in thinking as to what was possible for cycling on the streets of London, then this would be ten times more so.
I've already reviewed the problems and hold-ups and inevitable dissapointments that have accompanied the first two years from the publication of the Vision, and I don't need to go through that again at the moment. A huge battle for public opinion in the consultation on the E-W and N-S Superhighways was fought and won. Even in the week of writing this, on 18 August 2015, it has been announced that the London Taxi Drivers Association is trying to stop completion of these routes through the courts, though construction is well underway, and part of the E-W route is already being used by cyclists, as we saw in the picture at the top of this essay. This challenge will, I predict, fail, but it emphasises the battle that we still face in taking the lane, and probably always will.
Under construction
What do we have happening in London now? I can't cover it all, but we have construction of the East-West and North-South Superhighways, with the parts already consulted on due to be completed in Spring 2016. We haven't had plans for the full originally-promised Crossrail route from the 'western suburbs' (wherever they might be) to Barking, and I sense backsliding on this, on which we need to be very vigilant as the 2016 Mayoral elections approach. We have construction also ongoing of a pretty good looking Cycle Superhighway 5 between Oval and Belgravia, via a segregated two-way track on Vauxhall Bridge, which is already open. This should make an end of the Vauxhall Gyratory nightmare once and for all, and another landmark here is the first genuinely purpose-built, high quality piece of space reallocation on a Thames bridge. Though CS5 is intended to go to New Cross, however, we have not yet seem detailed plans for the rest of it: furthermore, the City of Westminster have not clarified how it will run north of Vauxhall Bridge, so these are more issues on which to be vigilant.
Current construction work on CS5 at Oval (photo by @cyclistsinthecity)
Some upgraded segregated sections of Superhighway 2 to Bow have just opened. I haven't experienced the route myself, but here is as early account. This route still clearly has major gaps and dangers that TfL has not presented satisfactory proposals on. But progress is being made on this notorious route; the cycle space is gradually being physically taken from motor vehicles.
New segregated section of CS2 with separated traffic light phases for motors and bikes, photo by@AViewofLondon
Separately from the Superhighways programme, as part of the Central London Grid (first proposed by LCC), Camden has been extending the segregated route on Royal College Street down Pancras Road, using stepped cycle tracks similar to those employed on Old Shoreham Road in Brighton. This work is also ongoing. Camden has plans also to create segregated tracks in both directions on Delancey Street, which will link the northern end of Royal College Street westwards towards Primrose Hill and Regents Park – a much needed part of the network jigsaw that I first proposed a long time ago, but TfL buses seem perversely to be creating problems with this plan.
New Pancras Road stepped cycle tracks, picture by Camden Cyclists
Camden, still the leading borough for cycle tracks, has plans for more stepped tracks on Gower Street (also in fact an indirect result of a suggestion I made, though the solution they are working on for Gower Street and Tottenham Court Road is not as good as the one I advocated, which would not have involved undoing the one-way system for cars). Work on designing signalisation to separate the cycle flows from motor flows on the five signalised junctions on Gower Street (similar to what has been done on CS2, above) is, I hear, ongoing. Further down the pipeline is work to create a proper cycle route on that busiest of central London cycle corridors – Bloomsbury Way, Theobalds Road and Clerkenwell Road – a concept that has been dubbed the Clerkenwell Boulevard. The boulevard concept is as yet only an idea from campaigners, originating with Andrea Casalotti, but it is being seriously investigated by Camden Council. It is a critically-needed part of the Central London Cycle Grid, linking the ends of the various Superhighways and other routes and creating a second east-west axis after the Embankment Superhighway. The boulevard would need to be implemented by Camden and Islington councils with TfL co-operation.
Consultant John Dales presents possible plans for a segregated Clerkenwell Boulevard at a Camden Cyclists meeting
And there is more in Camden. Finally the Bloomsbury route (or Seven Stations Link, the name we gave the route when we invented it in Camden Cycling Campaign in 2000) is to be upgraded to the capacity it so desperately needs. The plans are for the current two-way track on the north side of the road to become the eastbound track, with a new westbound track on the south side, and a whole motor lane removed from most of the route with one-way arrangements for motor vehicles that will minimise through-traffic and conflicts at the junctions, as described in detail here. So, another object lesson in how progress can be achieved: as at Royal College Street, a two-way track on one side of the road can, when the demand has been undeniably demonstrated, be easily upgraded by adding another track on the other side and making the original one-way, removing another motor traffic lane or a parking lane. Just as we predicted that the Bloomsbury route would be at capacity as soon as it was built, which it was, so I predict that the East-West and North-South Superhighways will be at at capacity as soon as they are built. And I think we can see how that will need to be resolved by the next Mayor.
Out in the north-west suburbs, where I live, we have seen no promising developments as yet. We await the advent of Cycle Superhighway 11, to run largely on the A41 from the West End to Brent Cross. We have not seen any plans for this so far, but it has to be of comparable standard to the Superhighways being built elsewhere in London. It must be at the very least a fully segregated two-way track on one side of the road (I favour the east side) achieved by removing one whole lane of motor traffic on the southbound side of the road. Nothing short of this will do, and I'll be watching this very closely. All we have seen so far has been some consultation by the City of Westminster on their proposal for painted cycle lanes on Avenue Road, between Swiss Cottage and Regent's Park. This will not do, and I strongly hope it will not do for Andrew Gilligan as well.
Looking forward with realism
I've made all the foregoing sound like a great success story, from my point of view, but I remain cautious. We are still a world from the comprehensive 'go anywhere' all-abilities cycle network we need in London to turn it into a world-class cycling city. I've already had the disappointment of expecting the manifest good of the cycle tracks implemented in Camden in the early 2000s to be rapidly understood and replicated all over London, only to find the project stalls for a decade and a half due to many other factors. I have ceased to believe there is any automatic route to progress, and that everyone else in the capital will suddenly see the light and start demanding this infrastructure in their neighbourhoods in a way that politicians find impossible to resist. The forces opposed to us remain very strong, and we are only a very small distance towards our goal. Progress after the current flurry of building, corresponding to the end of Boris Johnson's mayoralty, could yet stall with his successor, and we could be left in limbo for another decade. I now believe that every meter of new segregated space for cycling will continue to have to be fought over tooth-and-nail for the forseeable future.
I do believe that the current generation of segregated cycle routes, once completed, being much higher profile than those which we achieved in Camden 15 years ago, will make it obvious to far more people in London and the UK more generally that this is a means of achieving more pleasant and more efficient streets for everyone – cyclists, public transport users, pedestrians, business owners and motorists – whose results are superior to those produced by any other means: by that I mean, superior to the results achieved by mere implementation of lower speed limits, or superficial redesigns, such as Shared Space schemes. Another point is that, whenever we get a success in implementing a segregated cycling scheme, in my experience some foolish person always pops up to say "You did not ask for the right thing, you should have got elimination of all motor traffic on this road instead". Now it should be noted that usually this person never successfully campaigned for his preferred solution anywhere, nor discovered the real political and practical difficulties inherent in his idea, but has an unrealistic concept of the political process of negotiation over the use of street space, and no concept of a network of where the motor vehicles need to go.
I have always believed in putting forward ambitious, game-chaging concepts that will inspire people to see how our streets can be used in new, better and more efficient ways, and this was why I supported or proposed Royal College Street, the Bloomsbury Route, the Embankment route and so on. I have continually, in this blog, told campaigners not to 'fight over scraps' or make demands which are too small to make a difference or inspire anyone; this has been a guiding principle of mine. But I am also a realist, and no fundamentalist ecological anti-motor campaigner. I don't think cars, vans, lorries and buses will ever be eliminated from London, not in the lifetime of anyone now living, at least, I don't think they will be eliminated even from central London, and I don't really think they should be, either. They have many uses. They have become essential to our system of living. We can get a better balance incorporating them, but we cannot eliminate them. There will continue to need to be a practical working network of roads for motor vehicles, allowing access to all properties, throughout London, for all the future that I can foresee. Our cycle network proposals need to take this into account and allow it to be. All the schemes and proposals that I have mentioned and supported allow this.
Going back to those early days in Camden Cycling Campaign in the 1990s, one of the main arguments that Paul Gannon was advancing at that time, which didn't seem to have occurrent to anyone in UK cycle campaigning before, was that segregated cycle tracks, with continuing motorised use of the rest of the road, are really the only way to square the need for workable dedicated cycle space with the need for taxis, buses and delivery vehicles to continue to be able to operate on necessary through-routes. The argument for cycle tracks, as opposed to fully closing roads to motor vehicles, has aways been an utterly pragmatic one. However ambitious the plans have seemed, the intentions have been limited and pragmatic. I've never set out to solve all the problems inherent in the use of motor vehicles with proposals for cycle infrastructure, and I've not set out to redesign the entire urban transport jigsaw. I've not set out to change the world, only to achieve the limited objective of getting more people enjoying the experience of riding bikes. I've set out to import the best bits of the cycling systems of places that seem to do it well, like the Netherlands and Denmark, but I've not claimed that they offer all the solutions to transport or environmental problems.
What we need to be asking for next
So, where now for the campaign? We've established clear principles for what we would like to see. We've largely ended the internal arguments within the cycling world that blighted the earlier years of my history here. We have a programme ongoing from the Mayor for the upgrade of the Cycle Superhighways, and from some boroughs for the construction of some other routes, to fairly good standards. We have new junction designs being tried out that aim to eliminate turning conflicts between bikes and motor vehicles by separating flows in time that cannot be separated in space. We have some sensible design standards for the new cycle facilities in London, and some good people in place in TfL. We are starting to learn from the Dutch experience, from the nation so far ahead of the rest of the world on these concepts, but we have many elements that are obstinate to learning, There are many in the GLA and Transport for London, and many in more in the boroughs, who are in positions of power and do not believe in the cycling agenda at all. To get building started on the East-West and North-South Superhighways was a huge battle for the progressive elements in the GLA and TfL. We will need to convince the next Mayor, elected in May 2016, to continue, improve and extend the programme, to spend more on cycling, and spend it efficiently and productively. We need an extensive and intensive network, and we need the quality, simulataneously, to achieve our objective of 'mass cycling'. We need to make the next Mayor understand that, want that, and be committed to that.
But we also have huge problems in the division of responsibility in London government. We have a Mayor with very limited powers over roads (though he controls the funding of changes on them) and we have 32 boroughs of diverse political and philosophical complexions that control most of the network. We have odd bodies like the Royal Parks, the Crown Estate Paving Commission, the Canal and River Trust, and the Corporation of London, that control bits of territory – roads, paths and open spaces – all over the place, having the arbitrary and democratically unaccountable power to scupper the Mayor's cycling schemes. The Mayor very nerarly had to use his ultimate power, through the Secrtetary of State for Communities, to remove control from one of the boroughs over a section of road on the East-West Superhighway, in order to get that route agreed, and the Royal Parks continue to stand in the way of a sensible solution to the Superhighway in the Buckingham Palace area, and also threaten CS11, which will need to use a (closed) Outer Circle of Regent's Park.
TfL needs more powers over roads in order to implement a complete cycle network, without a doubt, but this is not within the Mayor's power to grant. It will require lobbying of the government to achive this, and at the moment it looks unlikely, with the continuing lack of leadership and stick-in-the-mud attitude to cycling from both the Department for Transport and the Department for Communities and local Government. Maybe we can somehow get the London MPs cross-party to propose extra powers for the Mayor and TfL, but this looks a long shot.
Having established the principles, I believe the campaign needs next to become one on the scale of the vision. Even without new powers for TfL, that body has in its power, if the next Mayor so wishes, to implement the type of solutions we are seeing on the latest Superhighways, or on Pancras Road, Gower Street etc, on every road it controls in London. We need to demand an end to main roads in London that do not provide practical separated space for cycling usable by all; Space for Cycling should not be restricted to a few arteries, it needs to become the standard, through a massive programme of progressive upgrading of the whole TfL-controlled network, that will, of course, need to deal with the remainder of the dangerous junctions as well. At they same time, the next mayor will need to cajole the boroughs into implementing similar solutions on all of their main roads and junctions, providing the necessary funding for them to do so. It's a tall order, but I have said we need to be ambitious, and this is what I think we need to be asking for in 2016: a programme of installation of cycle tracks on all TfL-controlled roads, plus strategic borough roads as well. In this context, the feeble and inefficient Quietways programme, re-cooking the old LCN concept, can probably be allowed to wither and die by the next Mayor.
The TfL route network, in red, shows the very minimum coverage that we need to start to achieve a segregated cycle network on London's main roads; eventually we will need segregation on all the white roads (borough A roads) as well.
Of course we need more than this; we need local rat-runs cutting, we need lots of traffic taken out of town centres and out of residential areas, we need better routes through parks, and the rest of it, but the demand for the tracks on all the main roads is a simple, comprehensible and saleable one, achievable, I believe in the medium term (say less than 10 years), and it would bring far more benefits and raise cycling levels faster than any other possible change. And it is not a fantasy, it's what they have in Copenhagen, I've seen it, and it works. Of course, if we demand it, we won't actually get cycle tracks on all the main roads, but getting the next Mayor to be working towards that objective would get us an awfully long way.
Does campaigning work?
I've laid a lot of stress here on what actually happened in the campaigns over cycling in London over the last two decades, as I saw, and I've often been accused of over-esimating the impacts of campaigns, by some in the cycling world who seem to want to regard us as powerless pawns in the face of some vast, faceless bureaucratic government machine that does what it wants, serves its own interests and does not listen to special-interest voluntary group very much – well, not in this field anyway. In this narrative, something called 'culture' or 'tradition' determines what sort of society and infrastructure we get, this traps us in certain patterns of behaviour, and there isn't a heck of a lot we can do about it. Well, this is a matter of personal temperament and attitude, clearly, and there is certainly something in the 'bureaucratic barriers' narrative. I have often railed against these myself. But I give this account as I experienced things, and my experience was very clear. Before 1998 and the start of the Camden experiments, no cycling campaign group in London asked clearly for Dutch-style segregated cycle tracks on roads. Camden Cycling Campaign decided to do so, as a policy, going far out of line with what the rest of the UK cycling world was up to at that time. We asked for them, and, strangely enough, after a determined campaign, we got them. Of course they weren't done exactly right and we got less than we demanded, but we got enough to work and demonstrate a principle, and now those pieces of infrastructure form a basis that is being extended in all directions, as well as having the original parts upgraded.
By exact parallel, it was only when London Cycling Campaign took on the historic divisions over the segregation issue, put the issue to votes, and formulated clear policy on the matter (which some strongly disagreed with, and continue to do), and launched an energetic campaign, mobilising the membership and a wider part of the public in favour of this new vision, that, lo and behold, an initially very sceptical mayor bowed to the pressure and started to build what we wanted. I should not neglect to mention the influence of other, allied but separate campaigning groups in all this, particularly the 'pop-up campaign' Londoners on Bikes, which worked to take the Go Dutch message to politicians in the 2012 London elections, CyclingWorks, which did a tremendous job mobilising big employers in central London to come out in support of the 2014 Superhighway plans, and Stop Killing Cyclists, which continues to organise protests in the wake of deaths. I've also mentioned the national organisations CTC and CycleNation coming round to a similar agenda, the Cycling Embassy of Great Britain, founded to promote that agenda nationally. In addition there has been significant support from the mainstream press, particularly the Evening Standard, which has adopted a very pro-cycling tone in recent years and been a strong supporter or the new Superhighways, and The Times, with its Cities fit For cycling campaign.
During the period I have covered social media became very significant in enabling the rapid organisation of protests, drawing in people who would not have been part of paid-up organisations. All these movements and opinion-formers, including the blogs and other social media, have supported each other in enabling the changes we are now seeing, but that the people at the centre, the existing and organised cyclists in London, decided exactly what they wanted to see, and decided to act on it, has, in my view, been decisive. The challenge now is to broaden the base of support massively; we need to get not only existing cyclists, but parents, teachers, academics, religious leaders, trade unions, mother' unions, old peoples' organisations, neighbourhood groups, amenity groups, disabled groups, and so on, on our side. CyclingWorks did a tremendous job getting businesses on our side, and that's a model that needs to be extended and followed up in other ways, particularly as the infrastructure starts to extend further out into the suburbs, where the views of employers become less important, but those of other groups more so.
In many ways our democratic process is broken, and broken into many pieces in London, with so many bodies having authority, and the ability to block change in certain areas. Some of this we cannot overcome now, but we can sometimes use this fragmentation to our advantage. There are always lots of people to whom we can appeal, who potentially have influence. If the councillors won't co-operate, one can try appealing to local MPs. If they are not interested, the London Assembly Members might well be, or even MEPs. It is possible to contact the Cycling Commissioner, and though Boris himself can be difficult to get hold of, he has various deputy mayors and assistants. There are usually potential points of pressure, and if you only have the Green Assembly Members on your side, you probably wont get very far, though they may make some noise. On the other hand, a broader alliance involving politicians and officials in different bodies and from different political or practical backgrounds might well provide the critical mass to move things forward.
"The argument your city is not like #Amsterdam is invalid. Neither was Amsterdam." Change takes work.
A relevant tweet from @TodUrbanWORKS, right-hand photo by Thomas Schlijper;note, in passing, how successful here was the conversion two-way to one-way flow for motor vehicles, while many in London currently advocate the reverse, rather than reallocating more space to sustainable modes.
Conclusion: some campaigning principles
Ask for big enough changes to make an obvious difference to the environment for everyone. Try to find out what best practice is, ask for that, and keep asking for it at all stages of the lobbying and negotiation process. What you get will probably be compromised, but if the starting point was good enough, the final result will be good enough to make a difference. Don't be under-ambitious or think "We'll never be given that". Note, for example, how the solution for the intersection of the East-West and North-South Superhighways at Blackfriars that the Mayor went for actually turned out to be more ambitions than any campaigner had asked for. The things you are compromised down to in the end are capable of improvement later, when the climate of opinion has improved, as with the widening Camden cycle tracks.
You have to take account how all the other transport modes and legitimate business and residential activities on the road are going to operate. There is no point crusading for a solution which is going to be widely unacceptable. You have to develop the ability to distinguish between the visionary, which is eminently practical and can prove popular once a certain conservatism has been overcome, and extreme, impractical and fundamentally unpopular solutions that will be perceived as anti-car, anti-choice, anti-business, or anti-pleasure.
Once you have a valid, practical and saleable solution, all objections should be analysed, questioned and shown to be weak or groundless. The variety of these is never-ending, and more will always be invented, from golf balls to bombs, but these can be shown up as mere irrational resistance to change, and most people have the good sense to be able to see this. The public can be trusted perhaps more than you think. Don't dismiss any population, anywhere, however it may appear from the outside, as being 'irredeemably wedded to the car'. Scratch the surface, and you find the most car-oriented people generally would like to be able to cycle their children to school, and they'd like their granny to be able to cycle to the shops like she used to, if they can see a feasible way of doing it.
Officials tend to want to keep doing the same things they have always done. Though nothing is actually telling them they cannot do what you are asking, they will invent reasons why it can't be done. Appeal to politicians at all levels and in all parties to make the officials work for them, as they are supposed to do, and not dictate their own agenda.
You may need to wait many years for it to finally pay off. But hopefully, one day, you'll be able to say, like Mike Aitken of Brighton, in his 2002 letter to London Cyclist:
Then in a blinding epiphany I realised: I had designed this route! This was the London Cycle Network in action, which I and thousands of LCC members had argued for over two decades....
I loved every one of them (even the dispatch riders). Sobbing by a blue cycle post in Mayfair, it was like Mandela walking free all over again.