Showing posts with label Cycle Superhighways. Show all posts
Showing posts with label Cycle Superhighways. Show all posts

Thursday, 28 July 2016

Five years ago

Five years ago today the video below was issued by London Cycling Campaign as part of a consultation exercise with its members to find out what their preferred campaign might be for the 2012 London Mayoral election. In it, I argued that the key first step towards mass cycling is the provision of high-quality segregated cycle tracks on main roads. This overwhelming support this concept gained from the membership led directly to the Love London, Go Dutch campaign, the commitments secured from Boris Johnson, his Mayor's Vision for Cyclingand the system of quality segregated cycle tracks we now see starting to be developed on the main roads of London, so conspicuously enabling all-abilites, 'eight to eighty' cycling in places where this had not be dreamed of before. So I am proud of this.



This is not to decry the proposers of the other three possible campaigns mooted in the video. They all make excellent points. But it was a matter of what was the best, most effective strategy for us to pursue at the stage we were at (and largely still are) in our development of a utility cycling system and culture in London.

In the video, the first proposed theme, that of getting larger numbers of children cycling to school, was an objective, not a mechanism. There was no contradiction or competition with my proposal there because the one was necessary for the other. A very large number of schools are only accessed on major roads that would need segregated cycle infrastructure in order to get kids and parents cycling to them. Other schools in other places would require different treatments of the roads around them. But putting a social result of good cycling infrastructure forward to be the campaign itself was not quite logical. And one might be struck by the fact that for a demonstrator background to that bit of video, a temporary 'artificial' situation was used, of the FreeCycle (then called SkyRide) ride round London where children do indeed come out cycling in large numbers because the roads are closed for a few hours. In contrast, the background to my segment was the real, permanent situation created by the Torrington Place cycle track in Bloomsbury (which was doubled in capacity last year).

The third proposal, for 'unwinding urban gyratories,' also contained a fallacy: the idea that merely making these major roads two-way would be of great benefit to cyclists and pedestrians, would actually transform them into pleasant places to be, without measures to also reduce the total motor traffic. I've dealt with that one here, and I think we've moved beyond this concept in policy terms now. I pointed out long ago how, where in it was tried in practice, for example in Piccadilly, the simple unwinding of gyratory systems proved to be no good for pedestrians or cyclists.

Then the final proposal, Love thy neighbourhood, for a campaign for area-wide traffic motor removal schemes through modal filtering, did of course advocate a policy that is essential to creating a truly people-friendly city. But it can never be the primary solution for cycling on the road grid that we already have, because we can't get rid of all the motor traffic arteries that most real cycle trips will need to use for part of the journey. A comprehensive application of Love thy neighbourhood principles would, at best, lead to a series of separate small districts in which cycling was an attractive option, cut off from one another by still-hostile main roads.

Then, proposing this as the first step from where we were, also, I hold, badly underestimated the huge political challenge of creating these calmed neighbourhoods in a political climate where most people cannot imagine everyday transport by bicycle and believe in general that having all possible routes for motor vehicles open is a good thing. The  Quietway element of The Mayor's Vision hit precisely this snag. It turned out, as I expected, that it was actually poltically far easier to carve space for cycling out of main roads by physical segreagtion, than it was to create routes on minor roads by closing rat-runs. Those who depend on car transport typically only think their street should be quieted. The next one, and the next one... they should all be  rat-runs to allow them to get places fast. This is a fundamental problem. We have seen that there is not yet political consensus on the general desirability and practicality of low-traffic residential areas in London.

We've seen that again and again, in Lambeth (Loughborough Road area), Camden (West Kentish Town), Hackney (London Fields) and so on, where progressive proposals from boroughs for area-wide traffic reduction in residential districts have been defeated by opponents. But, judging from consultation results, and also conversations I have with politicians, we do have consensus that main roads should allow protected space for cycling. We need the calmed neighbourhoods as well, of course, for many reasons beyond cycling, but it looks like being a while still before that argument can be generally won. Then again, a main point about the 2012 campaign was we were trying to influence the Mayor, and he controlled not the neighbourhood roads, but the major ones. So it made sense for the campaign to be calling for stuff that he could bring about directly.

The point about the main road treatments is they really do generate new users, they get people out of their cars and off the buses and tubes, and start to build up the mass of influence we need to get the other, more difficult changes through. That's why attempting to start with the other stuff wouldn't be very effective. That's why I stressed in the video: This is the first step to generating a real, mass cycling culture. The propaganda power of the cycle track carved in granite out of what was previously space ruled by motors is huge, and immediately comprehended by those who have never thought about this subject before, in a way that filtered permeability just isn't. In other words, as Paul Gannon said to me back in the last century: people cycling on separate tracks on busy roads make other people think I could could do that too to a far greater extent than any other engineering measure or piece of promotion does.

The proof of all this seems to me to be amply demonstrated by what we see on the roads of Central London today. Mind you, I never expected to see the scene that was videoed by Wayne David last Saturday at the Embankment, site of the East-West Cycle Superhighway, the route for which I first suggested to Andrew Gilligan, the future Mayor's Cycling Commissioner, in 2012.


Clearly this was not the normal usage of the Embankment even on a busy day for cycling. Bike Biz tried to get to the bottom of what it actually was: seemingly a semi-organised, semi-counter-cultural, semi-commercial youth street 'happening'. It attracted criticism, but I cannot but agree with one commentator on the BikBiz article, who wrote:
Looks like they've done a better job at getting young people on bikes than all of the government schemes put together...
They may have been preparing for the RideLondon FreeCycle this Saturday. This annual mass ride around closed streets in Central London has existed for many years under various names and sponsors. It was first suggested to the then Mayor, Ken Livingstone, by LCC. I've been somewhat negative about this event in the past: of the 2011 event, then called Sky Ride, I wrote:
In this event, a seven mile circuit of central London streets is given over exclusively to bikes for a few hours once a year, cyclists are dressed up like yellow canaries for no apparent reason except to unwillingly advertise Sky Sports, and a huge number of obstructive barriers is erected around The Mall to prevent anybody from conveniently walking anywhere, enforced by a huge number of paid-for-the-day officious event staff who shout orders at you and tell you what a good time you are having.
I saw it as  rather tokenistic and an excuse for the Mayor not taking decisive action to make cycling an everyday option for Londoners:
To expect Sky Ride to encourage more people to cycle under everyday London traffic conditions is like expecting the experience of taking a cross-channel ferry to encourage people to swim the channel. It unrealistic, as the conditions are so profoundly different.
But from where I sit now, having seen the changes since then, I reckon I was a bit harsh. Perhaps these events, though demonstrating the suppressed demand, did contribute to generating the political pressure that brought our present infrastructure programme into being. And, strangely enough, I am quite looking forward to this weekend's event. It looks far better than ever before, with a route that does not use the same roads there and back, as in the past, but is a real loop round, with various interesting alternatives to explore, using in part the new East-West Superhighway, but closing a lot of other roads to motor traffic besides. And, of course, if you are lucky enough to come from an appropriate direction, you can use a Superhighway to get there.

Maybe I will see you there. Look out for the Vole!

Tuesday, 26 July 2016

The Cycle Superhighway reaches Hyde Park

Construction of the East-West Cycle Superhighway (or CS3) in London has been continuing, and the sections on the roads in Hyde Park are nearly built, and to pleasing quality.

From the already-famous section on the Embankment, which opened on 6 May (the opening was Boris Johnson's last act as Mayor of London) the route is programmed to go via Bridge Street, Parliament Square and George Street (already constructed) via a new path on Birdcage Walk by St James's Park, a new bollard-segregated section past Buckingham Palace (mentioned in this post), and an upgraded path along the margin of Green Park in Constitution Hill, to the crossing of Hyde Park Corner, and thence along South Carriage Drive in Hyde Park. It will then turn sharply north on to West Carriage Drive (wrongly labelled as 'Exhibition Road' in TfL's own diagram, below) and exit the park at Lancaster Gate.


As I've pointed out before, this routing is not the most logical, and I expect most cyclists actually following the east-west route to connect from Apsley Gate at Hyde Park Corner to Lancaster Gate via the existing cycle path of the Broad Walk and the North Carriage Drive, which is more direct than the official route, which seems to have been chosen for political reasons between the Royal Parks Authority and Transport for London. I guess they did not want to 'encourage' more cyclists on to the already busy Broad Walk, full of pedestrians, cyclists and skateboarders, which has painted-line segregation and a poor design which is not effective at keeping pedestrians and cyclists apart. (One foolishness is that the benches must be accessed from the footpath by crossing the cycle path – it would be better to use the benches as a barrier.)

Rather than change this poor design in Broad Walk, the authorities have chosen to built a new high-quality route along the South and West Carriage Drives (which already had cycle facilities, but poor ones). This is in many ways a good thing. It creates a high-quality, high-capacity motor-traffic-free connection from Hyde Park Corner to Kensington Gardens and South Kensington (Exhibition Road) to replace the far too narrow, existing line-segregated path along the south side of the park. At the same time it benefits walkers, taming the rat-run of South Carriage Drive and taking flows of cyclists on the east-west axis well away from flows of pedestrians. The work on West Carriage Drive is also, in itself, welcome and long-overdue, replacing the strange and illogical mixture on on and off-road 'facilities' on different sides of the road that existed before, and creating a top-quality cycle connection north-south across the park from Exhibition Road to Westbourne Terrace, linking South Kensington to the future western extension of the Superhighway.

Boris Johnson opens the first phase of the East-West Superhighway in May
Two-way Superhighway on the west side of Bridge Street, heading for signals in Parliament Square
The old cycle path on Broad Walk does not effectively keep pedestrians out at busy times, and is often closed for events.
South Carriage Drive as it was: a wide, open fast rat run for cars with a painted cycle line that only hardened cyclists dared use, and space-wasting central islands that forced pedestrians to cross the road in two stages
Building work on South Carriage Drive in early July. A swathe of road on the park side is being segregated off for a 4m wide track. The old pedestrian islands are going, along with the old cycle lane, and the whole road is being moved southwards (to the right) slightly.
A completed section of 4m segregation on South Carriage Drive near Hyde Park Corner. The old cycle lane markings are still present and the red surface is old. Presumably it will be resurfaced.  
The track on the east side of the West Carriage Drive is largely complete and is 4m wide generally but widens to 6m at Alexandra Gate to allow for lanes for cyclists heading to and from Exhibition Road and cyclists following the Superhighway from and to South Carriage Drive.
Charlie Fernandes (@Charliecycling) demonstrates the width of the track approaching Alexandra Gate (Exhibition Road). The pavement has been rebuilt and the old, poor on-pavement cycle track is gone. 
The track in West Carriage Drive gracefully allows cyclists to bypass the near-permanent traffic jam that has always made cycling here so unpleasant and inefficient in the past
A chamfered kerb has been used here, which is good practice, and in the distance a table runs across both cycle track and carriageway at a pedestrian crossing point.
Detail of the speed table on the track. The ramp has cobble-ish stones but is fairly benign. I don't know why a zebra crossing was not used; are Royal Parks are antipathetic to these?
The track becomes very wide again on the curve north of the Serpentine Bridge. This is very good design; there is something of a slope here and some cyclists will be going fast at the junction of the track with the car park entrance: the extra width here gives room for errors by both drivers and cyclists

The same viewed from the north. An odd thing has occurred her in the cycle track having a black machine-laid surface, but the carriageway being reddish, as is often Royal Park's practice. The colours are thus the reverse of the Dutch convention.
When I viewed these facilities in early July they were not yet open, though of course cyclists were trying to use them. The building of the linkage through Lancaster Gate, a hitherto highly unpleasant racetrack gyratory and major blockage on the cycle network, had not started. I believe work in Westbourne Terrace, further north, has started, however. This is the last part of the Superhighway that is currently approved for construction. In April consultation took place on the next section, taking CS3 (and the Superhighways) firmly into West London, via the elevated Westway section of the A40. This idea, by Johnson's cycling commissioner, Andrew Gilligan, was not universally welcomed by cycle campaigners, who generally would have preferred a more accessible and humane route on the surface, but I supported it, as, due to the obstructiveness of the Royal Borough of Kensington and Chelsea, who seem to have a horror of the idea of cycle tracks on their roads, there was really no alternative for westwards continuation at that time. Transport for London have jurisdiction over the A40.

We await a decision by the new Mayor Sadiq Khan on the continuation of CS3 on the Westway, as well as the northward continuation of CS6, the North-South Superhighway, from Farringdon Road to Judd Street, and the commencement of works on CS11 from Portland Place to Swiss Cottage. All these were consulted on earlier this year, and, despite the vicious campaign against CS11 that I reported on, all secured a high level of public support. Khan must now start to make good his election promise to 'Make London a byword for cycling'. So far we have only heard generalities from him (except for a commitment to create a new walking and cycling bridge in East London and a commitment to pedestrianise Oxford Street, which may or may not work out well for cycling). He has also not yet appointed a successor to the highly-successful first Cycling Commissioner for London, Andrew Gilligan. Caroline Russell, Green London Assembly Member, has reported that this job, which is to be re-badged as 'Cycling and Walking Commissioner', is to be advertised soon. I am worried about this. 

The Cycling Commissioner post that Gilligan occupied under Johnson was a political post, as it needed to be. The job was not advertised because it needed to go to a political ally of the Mayor for the role to be effectively accomplished. In, Gilligan, an ally of Johnson, and indeed a friend, political heft was combined with diplomatic capability and  a great deal of knowledge about cycling in London, with a recognition of it as being generally dreadful, and a determination to knock political  and bureaucratic heads together in order to change things. A journalist, and thus an expert at publicity or propaganda, Gilligan was not a technical expert but understood enough technicalities to challenge experts when they stood in the way of progress, and was able to work with campaigners, if not always in complete harmony, then with a constructive friction; a kind of double-agent if you will.

Advertising the post of Cycling and Walking Commissioner suggests it is to be be downgraded to a technical role. A technician is likely to be ineffective in this highly political position. But we will have to see; I hope my worries on this are unfounded. They could be, with someone who is an expert in the post of Commissioner, but a strong driving force from the Mayor and Deputy Mayor for Transport. I suppose Gilligan could re-apply for the job; he is clearly the most qualified person to do it. His report on the progress of the first three years of The Mayor's Vision for Cycling, Human Streets, is worth a read.

While the segregated Superhighways have been the massive success we knew they would be, they are still far from where most Londoners live and work. They only represent the bare beginnings of a functioning cycle network. It would be a crime for momentum to be lost and for the the expertise now built up within Transport for London in building high-quality, effective cycle infrastructure to be dissipated, which is what will occur if we do not rapidly have a plan for expansion of the network, in all directions, beyond Zone 1. Khan has popular, fully developed 'shovel-ready' schemes at his fingertips in CS3 as far as Wood Lane, CS6 as far as Euston Road and CS11 as far as Swiss Cottage. He needs to approve these now, get his Commissioner in place, and produce the detailed plan for the next four years.

He has been busy, of course, with the EU referendum, and, in the aftermath, with pressing the government for new powers to allow him to keep London as closely linked to Europe as possible; these were the right things for him to be doing, and the strategic and financing powers he is seeking, if he is successful, can only be good for continuation of the cycling programme and modernisation of the streets generally. In particular, he needs far more authority over the infrastructure currently controlled by the boroughs, the Corporation of the City of London, and the Royal Parks. The lack of this authority is pointed to in Gilligan's report as a major reason why progress  on the Mayor's Vision has not been faster. Nevertheless, Khan should not repeat Johnson's mistake of moving slowly, being in office for eight (or four) years, and scrambling to try to build a world-class cycle network in the last few months of that.

Thursday, 10 March 2016

Demo on CS 11 tomorrow: show support for a cycle highway for NW London and a tranquil Regent's Park

When 'The Regent's Park' was laid out by John Nash and his associates in the early 1800s, the Outer Circle road was created, to quote a contemporary document, 'for the purpose of exercise'. At the time, this meant walking and horse-riding. When the villas around the park were built, it also provided access to them. When the wealthy who lived there aquired motor cars in the 20th century, of course they started using those on the Outer Circle. Because the Outer Circle remained connected to the roads around, via seven gates, it became a convenient cut-through for anyone using a motor car. There was no way to separate the cars of those who lived there from people passing through. Though the gates were closed late at night, and signs were put up banning commercial vehicles (but taxis were never banned), the Outer Circle became a rat-run, a dangerous and unpleasant barrier within the park, that greatly reduced its effective area, both through the noise and pollution experienced near the road, and because the road cut off the circle of the park outside it from the main body.

I've been campaigning to reverse this undesirable situation, with many other local people and groups, since around 2004. Note that I have not so far mentioned cycling. Though the traffic does make cycling on Outer Circle a far less pleasant experience than it should be, and it is not at all a suitable environment for family cycling, as this video demonstrates, and Camden Cyclists have been campaigning for the removal of through-traffic from the Outer Circle for many years, the argument has never been primarily about cycling. It has been to restore the Outer Circle and park to its rightful and proper purposes, as laid out by John Nash: an area for recreation and exercise, not traffic. An area free from noise and pollution. A park. The Outer Circle is needed for motor access to car parks, the zoo, to premises around the park, but it is not nededed as a through-road. It is closely paralleled by other roads that through-traffic should be using instead: Park Road (A41), Marylebone road (A501), Albany Street (A4021) and Prince Albert Road (A5025).

Finally, we now have a solid plan that will achieve our goal. The plans for Cycle Superhighway 11 (CS 11) from Portland Place to Swiss coittage, though falling short of the route we were previously promised, all the way to Brent Cross, at least in this phase, solve the problem of Regent's Park traffic to a considerable extent. They propose the closure of four of the gates: Macclesfield Bridge (Avenue Road),  Hanover Gate, York Gate and Park Square East and West, for most of the day, as shown below.


The other major element of this plan is a proposal to completely re-design Swiss Cottage gyratory system. This is another thing that so many in the borough of Camden and beyond have looked forward to for a very long time. All routes to the south of Hampstead and West Hapstead converge on this junction, with has long been a barrier to creating a decent cycle network in Camden. The plan for this horrible, filthy 1960s sea of traffic isolationg the famous Swiss Cottage pub and the Odeon Cinema is that it should be removed entirely. The bulk of the traffic will be taken down an A41 made continuous, and two-way, on the west side of the current gyratory, while the eastern side, outside the Hampstead Theratre, the theatre school and the library, will be turned into a bus-only road, with wide pavements, trees down the middle, and segregated cycle tracks. This will be a massive environmental transformation of the area, and one for which many people have fought hard for a very long time.

How the CS11 plan will replace a sea of traffic with an oasis of calm at the north end of Avenue Road
The section of Avenue road south of Adelaide Road will not be car-free, but it will become far less convenient a route for general traffic, as to reach it traffic from the north will need to turn left from Finchley Road and then right. Furthermore, for most of the day, it will not give access to Regent's Park or towards the West End. It will represent a legely pointless detour for those who do not have specific business in Avenue Road or adjacent residential roads. We will see an end to so much traffic from the north, Finchley Road and Fitzjohn's Avenue, bombing past Swiss Cottage and into Regent's Park via Avenue Road. That traffic will largely stick to the A41, where it belongs.

The scheme is far from perfect in my view. We need the closures of the gates to be full time (there is an exception betwweren 11am and 3pm) and we really need the southern part of Avenue Road more fully closed to traffic (traffic can still turn left or right into Prince Albert Road under these plans) as there is only room for painted (mandatory) cycle lanes on the southern part of Avenue Road, not for segregated tracks, as we have seen on other recent Cycle Superhighways. However, this scheme gives so many of the big wins that campaigners (not just cyclists) have been looking for in this part of London for so long, we all need to support it. It represents a brave move by Boris Johnson, Transport for London, and Camden Council.

But the forces ranged agains CS 11 are strong. There has been a major campaign against it mounted by NIMBYs and those wedded to motor vehicle domination of London, with its attendent epedemics of pollution, isolation, exclusion and inactivity. 2400 people have signed a petition agains CS 11:


Furthermore, local papers have uniformly been reporting CS 11 negatively, in terns of 'howls of protest' supposedly emanating from many and various quarters: to give a flavour of the nonsense that's being spread here's extracts from some articles:

Clive Beecham, chair of the St John’s Wood High Street association said the plan to restrict vehicular access to Regent’s Park from 11am-3pm would create “traffic chaos” as drivers looked for alternative routes.

He said: “By redirecting traffic through St John’s Wood what you are doing is storing up traffic chaos for the next ten to 15 years. 
“If they shut off Avenue Road it will be a complete nightmare. As residents we should have the right to use the route through Regent’s park.
 He added: “It’s also going to be the worst possible thing for the High Street because the impact of traffic in one area is like a domino affect on others. As a community we need to rebel against it.
------------- 
Stephen Lewis, who lives in Lyttleton Close, Swiss Cottage, said bicycles could be like “cholesterol clogging up London’s arteries”. 
“If London were a human body, it would be facing an invasion of cholesterol which threatens the arteries,” he said. “In this case, for cholesterol read cyclists. We are slowly being strangled by measures implemented to facilitate the journeys for cyclists but at the cost of slowly squeezing out other road users.”
Swiss Cottage resident Ian Braidman said: “St John’s Wood and Primrose Hill, to the east and west of Avenue Road and Finchley Road, will become a rat-run for cars endeavouring to escape the traffic congestion this is designed to create.”
------------- 
Actor Tom Conti, who is campaigning against the project, told the West End Extra: “It will cause mayhem. The whole area will be destroyed – but it will not happen. We are going to make this a national issue. A bike lane from Portland Place to Brent Cross will be absolutely massive. There will be a solid queue to Hatfield. Cyclists should be made to pay road tax. If they want a special road, they should have to pay for it. 
“This is the beginning of some kind of Soviet idea to ban all vehicular traffic from London.”
---------

There's loads more like this, and it's not just the reporters on the local press, or fossilised white males breathing petrol fumes who are opposed. A group calling itself 'NW8 Mums; a community for all our mums' (seemingly without irony) has published this exhortation:
We cannot understand how this scheme was ever even thought of, let alone that it might be allowed to go through. We must all work hard and together to make them see sense and drop it, before all our lives are ruined.' 
Worse, Westminster Council seem to be doing all they cvan to stop the plan. They have organised higly biased 'public meetings' where offiers have briefed against TfL's plans and have given no real platform for the supporters of CS11, who have been howled down by angry mobs. Westminster's Councillor Robert Rigby has said at one of these meetings, as reported by my correspondent (and this is likely to be the official view of Westminster Council):
· Residents do not believe the results of modelling [TfL modelling that demonstrates little increase on traffic on other local roads]. 
· The Outer Circle can accommodate all road users. 
· If a cycle track can be created along Birdcage Walk, despite heritage considerations, something could be done for cyclists on the Outer Circle [Note he doesn't explain what]. 
· Pollution will get worse, both on main roads and on side roads. 
· No account has been taken of HS2. 
· Closing the park gates is a step too far.
Local politicians are hearing the noise and nonsense arguments from the opponents of CS 11 too loudly. This has to be challenged, or the scheme will fail. London Cycling Campaign, Camden Cyclists, and the others who support CS11 and  traffic-free Regents Park, including Camden Friends of the Earth, the Canal and River Trust, and Westminster living Streets, have decided enough is enough, and we are organising a protest to make some noise in support of cycling, CS11, a clean, green park, and less domination of NW London by motor traffic.

The protest and ride is at 6:00-7:0pm tomorrow, Friday 11 March, starting at Park Square East. Everyone is welcome on bike, foot, wheelchairs, or mobility scooters. Bring banners ands make a noise. We will be riding slowly a circuit including Park Square East and West, Outer Circle and Marylebone Road.

If you can come, and also if you can, be absolutely sure to fill in the consultation by 20 March. Don't only to only tick the overall/first section “support” button, but also tick Swiss Cottage support, gate closures, Portland Place segregated tracks etc., support specifically. More responding hints from LCC here.

We know that proper, serious, cilty-changing cycle schemes are massively popular: witness the 60-80% approval ratings for the consultations on vareious sections of TfL's East-West Cycle Superhighway, currently cutting a dramatic swathe through Parliament Square. But they also create fear, noise, and misguided panic in a place that has been so long in thrall to the car and the concept of engineering the environment around it, rather than around people on foot and bike.

Protest, ride, write to the papers, lobby your councillors, answer the consultation, and help make London a little bit more like the clean, civilised New Renaissance city that visionary architects and planners of the past, like Nash, and Christopher Wren before him, dreamed of. Please support CS11.

Here comes Madge!* Cycling infrastructure and roads reclaimed from motor traffic help all those who are excluded by a motor-dominated transport system, not just 'cyclists'.

*She may not really be called that.

Sunday, 30 August 2015

It's often only one person

Such is the pace of developments in London cycling infrastructure (planning if not actual execution) currently that a couple of details in my long blogpost of 11 days ago have already been superseded.

The most striking one is that a plan has now been produced for taking the East-West Cycle Superhighway past Buckingham Palace in a sensible manner, with the support of the Royal Parks Authority. There will be, if this goes through, a two-way segregated track on the north and west sides of the Queen Victoria Memorial linking a new cycle track on the north side of Birdcage Walk (currently the most stupidly-designed road in the area, with masses of space wasted in the middle of it, with giant pedestrian islands and dead areas between) with a widened two-way track on the north side of Constitution Hill. The segregation around the Memorial will be with bollards, removable for ceremonial purposes, unlike on most of the Superhighway, where it is with kerbs.

TfL visualisation of the bollard-segregated track in space taken out of the road (middle background)
Plan for the Superhighway link at Buckingham Palace
This all looks sensible enough, and people should respond to the consultation, supporting it, by 4 October. The question that is posed is: what was the problem before? Why was the Royal Parks Authority, until last week, bizarrely insisting there should be a gap in segregated the Cycle Superhighway in front of Buckingham Palace for 'safety, operational and aesthetic reasons', which would have caused, as Cyclists in the City pointed out, the Superhighway flow to get mixed with hundreds of gawping, snap-happy tourists on the Mall Service Road (effectively a pedestrian area, shown hatched just south of Green Park on the map above), obviously a recipe for disaster, and a position made even odder by the fact that, for the Superhighway solution in Hyde Park, the RPA was insisting that cyclists not share any of the current subdivided paths, but be routed via the roadway of South Carriage Drive.

South Carriage Drive, Hyde Park, a bizarrely under-used road space, will take the next section of the route westward 
Of course I've not been party to any behind-the-scene negociations, but Ross Lydall of the Standard, who generally seems to be very well-informed, seems to make things very clear:
The appointment of a new chief executive at The Royal Parks, which is responsible for the roads around Buckingham Palace, has been key to resolving the dispute.

Previous chief executive Linda Lennon was a fierce critic of many aspects of Transport for London’s 18-mile “Crossrail for cyclists” that passes through Hyde Park, Green Park and St James’s Park as it links Barking and Acton. 
The Royal Household is understood never to have objected to the plans. 
Mr Johnson said: “This is the final jigsaw piece in what will be one of the world’s great cycling routes. I am absolutely delighted that we and the Royal Parks have been able to reach agreement and I pay tribute to the agency’s new chief executive, Andrew Scattergood, his staff and TfL officers for the immense work they have put in to make it happen.
So an anti-cycling Chief Executive left, and suddenly the 'safety, operational and aesthetic' objections all disappeared and the RPA was left looking rather less like the car-oriented dinosaur that campaigners had perceived it as before (the Royal Parks of course being full of roads that are full of cars, roads used as normal parts of the through-traffic system of London, with this fact not seeming to cause the RPA any distress or sense of conflict about their purpose). Hopes are raised that, after decades of campaigners asking for it, the Outer Circle of Regent's Park might cease to be a huge gyratory for motor traffic, but might be changed so as to allow only motor access to the car parking, the zoo and residences, and to facilitate a much-needed north-westbound Cycle Superhighway, CS11.

So my message here is that often, despite outward appearances of implacable homogeneity of institutional opposition to progressive schemes, it can often turn out to be only one badly-placed person, in reality, who is causing the problem.

On the flip side, one well-placed progressive person can often galvanise an organisation and create more progress in a short time than has been achieved for many years. And I have to hand it to Cllr Phil Jones, Camden's Cabinet Member for Transport that he has, with the assistance of his officers, got Camden making better progress on actually implementing a Central London Cycling Grid (to complement the small number of built Superhighways) than all the other boroughs combined. I reported in my last post that the promised link between Royal College Street and Primrose Hill was currently stymied by bus-related arguments, but apparently these have been overcome, and Camden is now produced an attractive plan for consultation, which I recommend all London cyclists respond to favourably as well.

Proposals for Pratt Street
The proposals for Pratt Street , between Royal College Street and Camden High Street, and Delancey Street, betweem Camden High Street and Parkway, show a huge improvement over the current state of these space-wasting, unattractive, rat-runny one-way westbound roads, with a stepped cycle track going westbound with the motor flow, and an eastbound contraflow track either stepped (Delancey Street) or fully segregated (Pratt Street). The westbound flow for bikes is currently allowed, but is unattractive, particularly with the competition for road space with large vehicles including buses and squeezing at the corner of Camden High Street and Delancey Street, but the eastbound flow is not possible, cyclists from the very traffic calmed and reduced Primrose Hill area needing to access the Royal College Street or St Pancreas Way routes being forced to go via congested Chalk Farm Road or busy Parkway and Camden Street. This scheme promises to fix this long-standing, bad gap in the cycle network (as well as generally improving these streets for everyone) and others have seen the potential of this. Andrew Gilligan, the Mayor's Cycling Commissioner, has been touting this as making possible numerous long-distance cycle connections across London, in combination with the East-West and North South Superhighways:
Once the links are complete, cyclists will be able to ride from Swiss Cottage and Camden Town to Canary Wharf, Barking or Elephant & Castle entirely on separated cycle tracks or low-traffic streets. It’s testimony to the power of the relationship between TfL and a borough genuinely committed to cycling.
Actually he could go go further. If the Mayor actually builds CS11, promised for 2016, it will be possible to go all the way from Brent Cross to Canary Wharf, Barking or Elephant & Castle on cycle tracks and low-traffic streets. So I congratulate Cllr Jones on getting his plans this far, though I have disagreed with him on the best solution for Tottenham Court Road and Gower Street, Camden's 'West End Project'.

With the West End Project,  I felt, as I said last year, that fixation on the objective of undoing a gyratory system for cars and buses had got in the way of visualising the best possible ways of changing these roads to benefit pedestrians and cyclists, who are supposed to be at the top of Camden's 'transport hierarchy'. Camden's planners are now doing as good a job as they can on trying to solve junction problems that will be introduced by having stepped cycle tracks running in both directions on a two-way (for cars) Gower Street, but I think there are fundamental problems here. The cycle tracks will be on the same level as the motor lanes at the junctions, so reduced to painted markings, Danish-style, and therefore an attempt to signalise the cycle flow separately from the turning motor flow is likely to result in cyclists just getting blocked off by cars and vans invading their space. There is something of an attempt to combine Danish and Dutch junction principles here which I fear will not work. The Danes merge the cycle flow with the left (their right) turn for motors and expect cyclists to turn right (their left) in two stages. A full Dutch signalised solution separates all the conflicting cycle/motor movements in time, but depends on segregated tracks running right up to the junction, which cannot be invaded by motors. Without segregation at junctions, how can separate signalising work without risking the blocking-off of the ahead path for cyclists on what is certain to be a congested road? However, Gower Street clearly is not wide enough for two-way motor flow plus two-way cycling segregated at the junctions in the manner of a large Dutch signlised junction. The problem here is the whole architecture of the system left by removing the one-way flows for motor vehicles. (Another bad problem with the Gower Street plans is that one of the 'Danish' tracks will be interrupted by a loading bay, something the Danes would not dream of.)

But, to get back to my main theme here, we've got some individuals in influential positions now doing a lot of good for cycling in London, and we've got one or two who have been really getting in the way. Linda Lennon may have gone, but we still have a fine example of the latter tendency in Hackney Council's Planning Sub-committee Chair and perhaps Phil Jones's polar opposite, Councillor Vincent Stops. Stops has been a long-standing and clear opponent of segregated cycle infrastructure, and most likely through his influence Hackney Council has prevented TfL implementing Cycle Superhighway 1 on the A10 in the borough, consigning it instead to indirect back-streets in the manner of the old poor-quality London Cycle Network, and sacrificing the safety of the majority of cyclists who will always wish to cycle on the direct, main road, on which 28% of the serious casualties to people on bikes in Hackney now occur. Stops has actually written a blogpost on the subject of Cycle Superhighway through Hackney, but this does not really attempt to justify the route that Hackney Council has forced on the Superhighway on any logical grounds, rather, it attacks the whole concept of cycle routes:
A route-based approach is limiting, when streets are better regarded as a network
Drawing lines on maps, declaring them cycle routes and investing heavily along the route seems to capture the imagination of cycle planners and some campaigners, even though hardly anyone cycles such a route from end to end. Some of the investment that comes from such route-based planning will be good cycling value for money. However, instead of spending all this money on CS1, there are numerous other locations in the borough where investment would have been better directed. Improving these other locations, rather than using a large pot to titivate, and not substantially make things better for people cycling would certainly be better value for money, in terms of improvements to cycling.
In Hackney, in contrast to the route-based approach, the most innovative recent work has been the creation of a Bikeability map which assesses all of the borough's streets, regarding them as a network. Incrementally improving this network, particularly where there are historic clusters of collisions, will provide the best value for limited cycle and road safety funding. Sometimes improvements may be made opportunistically.
Hackney's 'Bikeability map'. The green on minor roads represents a lower 'Bikeability skill level' than the grey-brown on  (e.g) the A10 running straight N-S down the west side of the borough.
The first thing to say here is there is nothing 'innovative' about these 'Bikeability maps' for urban areas; I've been hearing about them for years from various campaigners and officials. The approach sounds reasonable enough, if it is being used to identify the worst locations that require remedial action, but, in practice, these maps are always used as a displacement activity to avoid doing what really needs to be done. Stops is being disingenuous in his talk of 'limited cycle and road safety funding'. Hackney could have had the funding from Transport for London to transform the A10, the road, I repeat, where 28% of all cycle casualties in Hackney occur, the most direct sand useful route in the borough, into an attractive, safe, high-quality cycle corridor. They chose not to take this, but to fiddle about on back-streets instead. Stops' claim that
Hackney Council has to be congratulated for getting so much value from the Cycle Superhighway process
will be regarded with some very raised eyebrows in the borough and beyond.

Of course I'd not dispute that streets should be regarded as a network, and, ultimately, almost the whole network needs its quality raised for cycling, but the points that are missing from Stops' analysis are 'utility' and 'standards'. Some routes are of far more utility and importance to cyclists than others, and it is here that investment at this early stage in developing a cycle network must be concentrated, to develop what I'd describe as the 'backbone network' of obviously attractive and useful routes that is needed to pull people in to cycling. Generally, but not always, these routes will be on the main roads, where, to achieve acceptable standards of actual and subjective safety, cyclists need segregation.

Stops wishes to focus on the wider network, and implicitly, to focus on small roads, because he seems to have a horror of the idea of subdividing the space on larger roads using kerbs, which he considers to be 'pesky' things that will disadvantage pedestrians, bus passengers, or others. But the 'Bikeability map' approach that Stops praises is fundamentally discriminatory and opposed to inclusive cycling, because it accepts a general and permanent compromise between efficiency and safety that is inimical to creating to a quality cycle network with uniform provision. What this 'Bikeability' thing, in this context, is really about is classifying cyclists, not roads. The very concept of 'Bikeability' in play here is a motor-oriented one, confusing 'cycling skill' with 'willingness to cycle with motor traffic'. Brave 'skilled' cyclists (normally young men) will continue to push their way down the A10, with its bad crash rate, because it is the most efficient, useful route for them. The slow and less assertive will, if they try to cycle at all, which most of them will not, be consigned to an indirect, low-priority, hidden 'superquietway' that will not be easy to use and will not get them to the places they need to go. This is not a good approach if your aim is mass cycling. But I sense this may not be Stops', or Hackney Council's, real aim.

Stops goes to a bizarre extreme in inventing arguments against segregated cycle tracks, for example when he commented on Twitter on the forthcoming East-West Superhighway:
How will an 8 year old get through a more congested Parliament Square as a non CSH route user?
...as if there are eight year-old cyclists using Parliament Square now who could possibly could be inconvenienced (rather than enabled) by the cycle track! (Even if you accept the wrong contention that the cycle track will cause congestion, I challenge Stops or anyone to stand at Parliament Square for a day, or a year, counting eight year-olds on bikes. There will be more flying pigs seen, except, of course, when road are closed for events like the RideLondon.)

Stops likes to claim that Hackney is London's best borough for cycling. I'm sorry, but the truth is that cycling in Hackney is, by and large, crap. I've often cycled in Hackney, and I cycled through Hackney the other day. There is no provision on main roads, which are choked with buses and other heavy vehicles, and the minor road routes are slow, deprioritised, badly-maintained and uncomfortable. You are bumping over severe traffic-calming all the time, and badly-maintained surfaces, taking long ways round, trying to follow neglected or non-existent signage in obscure places, you are constantly having to give way to main roads, or even slightly more important roads, and where you meet a main road to negotiate a straight across or dog-leg junction you have no help and no protection. Hackney can't even can't keep these poor backstreet routes open. The famous one running east-west from Canonbury to London Fields is currently blocked by major digging where the railway goes over in Middleton road, and cyclists just have to use the pavement.

Cycling in Hackney is inefficient and dangerous on the backstreet routes that borough provides, and very dangerous on the direct main road routes that it does nothing to make attractive or comfortable. Contrary to Stops' frequent claim that Hackney is some sort of great cycling leader amongst London boroughs, it actually (according to TfL cycle counts) has a similar cycling level to the boroughs of Richmond upon Thames, Hounslow, Islington and Lambeth, places with very different local circumstance and policies. The 2011 census gives utility cycling actually at a higher level in Richmond upon Thames than in Hackney (though I don't put much store by census transport data, as it comes from a self-survey, and may just mean that Richmond people want to believe they cycle more than Hackneyites do).
TfL counts had (2013) Hackney on 6% of journeys compared to Richmond, Hounslow, Islington and Lambeth on 5%

2011 census data had Richmond ahead of Hackney on cycling
Richmond and Hackney are very different places, the former outer London and Conservative-controlled, the latter inner London and Labour, but I think the reasons for the high (by very low UK standards) cycling levels they share are a result of similar factors. Both have within them or very close to their borders a lot of parkland and waterside space where cycling is possible, attractive and car-free (in Richmond Park and other parks and along the Thames in the case of Richmond and in Victoria Park and other parks and and along the canals in the case of Hackney). In neither case is this much to do with the roads policies of the council. Hackney is, in addition, a flat and compact borough within easy commuting distance of the City of London, and it does seem that Hackney does disproportionally well out of commuting to the centre (it is the commuting mode share that the proponents of Hackney's 'cycling success' usually quote), while cycling to school remains at only 2% of trips, not high even by UK standards, and indicating the lack of a genuinely broad-based cycling culture.

Cllr Stops' partner Rita Krishna, is strangely (or not so strangely, if you know the local situation) on the Committee of Hackney Cycling Campaign. Since she appears to share the same views as Stops, those Hackney cyclists wishing to campaign for good-quality infrastructure in their borough had best lend their support to the rival campaign, Hackney People on Bikes, which does support the policies promoted in this blog (which are also the official policies of the London Cycling Campaign). In any case, it looks like Hackney will continue to be a blockage to the development of a high-quality, inclusive cycle network for Londoners while Vincent Stops remains influential on the borough's transport policy.

I paid a visit to the Embankment on Friday to see how the East-West Superhighway construction is getting on (and to examine those pesky kerbs). Only a 500m section is currently open, between Horseguards Avenue and Westminster Bridge, and it is only accessible to westbound (or southbound) cyclists, as there is no way to reach it eastbound. However, looking at the rest of the work on the two kilometre section between the open section and Blackfriars Bridge, I expect all this length to be open by the end of the year.

Completed Superhighway section looking south (up river). The basic two-way track is 4m wide in general.
This is all cycling space. The right-hand area is a lane for right-turning cyclists, who will cross the carriageway using the signals 
Completed Superhighway section looking north (down river)
The track is smooth, machine-laid tarmac. The kerb on the river side has not been altered, though I think it has been made lower by laying of the track. The kerb on the new segregating island is chamfered,  a good detail, allowing wider effective width and reducing the chance of pedal-strike.

Make no mistake, this is the proper thing, and very satisfying to see, as the first piece of truly high-quality cycle infrastructure ever built on a main road in Central London. This is the most significant thing done for cycling in London since Camden built its tracks at the turn of the century, and, before that, well perhaps the most significant infrastructure put in since the 1930s (though that was suburban, not central). It's worth re-emphasising here: this is a gain from road-space. Nothing has been lost by pedestrians (in fact a lot has been gained). A simple transfer has taken place from space dominated and, from the point of view of most people, monopolised by motor vehicles to space dedicated to active travel. We'll see a lot more of this with the rest of this Superhighway scheme, and the north-south one from Elephant and Castle to the border of Camden. The politicians and public servants, like Vincent Stops and Linda Lennon, who say they support cycling, but do not want to see this kind of thing on their patch, will in future be seen more and more as an anachronism and an impediment to the development of a more civilised, pleasant and sustainable city. 

The new Superhighways and Camden's grid routes point the way to a future pattern of use of road space that gives everybody an opportunity to cycle their journeys if they wish. The discriminatory approach based on keeping direct main routes as the cycling preserve of a tiny fit and brave minority must be consigned to the dustbin of history.

Friday, 31 October 2014

The Mayor's Vision for Cycling in London: 18 month assessment

I last wrote extensively on The Mayor's Vision for Cycling in London shortly after it was announced, in March 2013. We are now 18 months on, so I thought I would try to assess 'how it is going'.

A reminder: the Vision is aiming for a doubling of cycling in London over 10 years, achieved mainly through these four programmes:
  1. Cycles Superhighways (Including the E-W "Bike Crossrail")
  2. The Central London Grid
  3. Quietways outside Central London
  4. Outer-London mini-Hollands
About £900 million was earmarked for spending over 10 years on these, but only £370 million was expected to be spent by May 2016, the rest of Boris Johnson's tenure as Mayor, with the rest being dependent on the wishes of whoever is elected to replace him.

Now the first thing to say is that the rate of progress has been disappointing. Summer is the usual time for spades to be put in the ground for major work on the roads.  I thought a year would be adequate for Transport for London to put their plans in place and assemble the correct staff, and that we would probably see something happening this summer. But summer passed, and nothing much happened, except a draft of the much-delayed, and in the event exceedingly lengthy and somewhat un-focused London Cycle Design Standards document was released for consultation. (See the excellent Cycling Embassy response on this.)  The Cycling Commissioner, Andrew Gilligan, has been giving talks everywhere, and press releases have been common, but there's been no spades in the ground. What has been built in the last 18 months was either in train before (as was the Cycle Superhighway 2 extension), or the result purely of a borough initiative (as was the rebuild of the Royal College Street cycle track).

On the other hand, though it is getting going painfully slowly, there are signs of a seriousness to the project that go far beyond what we have been used to seeing before in the politics of UK cycle provision. I have, for example, actually watched (sad, benighted creature that I am) the examination of the chief officers of the project, including Gilligan and Lilli Matson, TfL's Head of Delivery Planning, by the GLA's Budget Monitoring Subcommittee. It is very clear if you watch this that we are in a rather different world to the borough Town Hall meetings of old where a 'Cycling Officer', a rather unimportant council employee who happened to be quite keen on cycling, would turn up before a few pretty uninterested councillors in a dirty yellow lycra suit and explain how he proposed to spend a few thousand pounds on painting some lines on pavements. Now, we have people establishing the serious business case for the expenditure, monitoring and auditing by actual outcome, of how many cycle journeys are generated, for hundreds of millions of pounds spent across a city of 10 million people. This is a hard-headed world which is little to do with wanting to 'look green' or create a bit of good PR with 'cyclists', but everything to do with keeping a major city moving and keeping it in business, and spending public money sensibly and effectively.

So what of the four programmes? In brief, if you haven't got time to read further, I'd say this: The Cycle Superhighways are now looking quite promising as the standards, programme and timetable for them is becoming clear. The timetable, nature and likely ultimate success of the Central London Grid is much less clear, and that is because TfL doesn't control most of it, the boroughs do. The programme for the Quietways is becoming slightly clearer, but the standard of implementation is in doubt. There seems to be a problem with people understanding the nature of the Quietways; Andrew Gilligan seems to have to keep explaining it again, and that must be his fault for not being clear enough from the start. The mini-Hollands still have not progressed sufficiently to draw any conclusions.

Superhighways

According to Gilligan at the budget subcommittee, around half of the total budget for Superhighways (£209m) is scheduled to have been spent by May 2016. The initial four superhighways that were created by painting the road blue – CS2 from Stratford to Aldgate, CS3 from Barking to Tower Gateway,  CS7 from Merton to The City  and CS8 from Wandsworth to Westminster are promised to be re-engineered 2016. However, the only one for which we have seen plans is the notorious CS2. These are being consulted on currently (ends 2 November), and look worth supporting, containing a large element of segregation, though the solution for Bow Roundabout is still sub-optimal, and a further round of improvements here is promised at a later date.

Then there are the two 'new' un-numbered Superhighways, known as the East-West (previously 'Bike Crossrail') from Tower Hill to Acton, and the North-South from Kings Cross to Elephant & Castle. These are due to be completed by May 2016, except for the Westway section of the East-West. They are being consulted on now (here and here). You should act quickly to respond, if you have not already done so: consultation closes 2 November. The plans have been well-received by campaigners and bloggers, being again for mostly segregated tracks achieving a generally high standard of provision and capacity. These new Superhighways also meet two of the main criticisms levelled at the original Superhighways plan: that the routes didn't go into the centre, and they didn't connect up. These two Superhighways will cross at Blackfriars north junction, though they will be at different levels there. They will be connected by a major junction remodelling, converting one of the current slip-roads off the bridge into the connecting two-way cycle track. Construction of all this will mark the final success of the Blackfriars campaign that this blog covered extensively in 2011.

What LCC demanded in 2011



What is now being offered. Sustained campaigning and protest by thousands of people put this on the table as a realistic possibility.
The plans for the East-West and North-south Superhighways are really not complete at all. The North-South, in particular, seem not to deserve its name, as it is just a 'stub' compared to the far more important East-West, and most of what has been planned is south of the Thames, further emphasising the Superhighway network's already very strong south-of-the-Thames bias. Far from getting anywhere near 'north' London, it peters out in the backstreets of Clerkenwell's existing Seven Stations Link (London Cycle Network Route 0) in the Ampton and Cubitt Streets area, seemingly baffled by the King's Cross Gyratory. It could connect with Camden's proposed route on Midland Road up towards Camden and Kentish Towns ultimately, but still it seems disappointing in concept compared to the East-West route: we might have expected a high-profile main road route up at least as far as Kings Cross. However, let's not be churlish: with a good segregated cycle track on Blackfriars Bridsge, we could finally declare the Battle for Blackfriars won.

There are still big gaps in the East-West plan, mostly concerned with the Royal Parks. What to do at St James's Park and in front of Buckingham Palace still has not been decided, though the suggestion of replacing the horse ride by Constitution Hill with a cycle track is a good one. Andy why, at the chaotic Wellington Arch, why do TfL propose 'a larger shared space to replace sections of grass to provide more space for pedestrians, cyclists and horses'? Why not just have clear dedicated routes so everybody knows where they are? Using the Carriage Drives in Hyde Park is a good plan, as they don't get disrupted by the park's frequent commercial entertainments, but these sections have not been designed yet. Different options are given in the Lancaster Gate area, and the idea for using the elevated A40 Westway to Acton seems still sketchy: further consultation on this is promised in 2015.

On the other hand, the plan for The Embankment, Bridge Street and Parliament Square is a clearly-defined game-changer: a high-capacity, high-profile two-way cycle track driven right past the Houses of Parliament and across the formerly intimidating and hostile gyratory of the Square. For this section alone the plans would deserve massive praise, and the scale and ambition of the East-West and North-South Superhighway concepts overall demand that all who are interested in the environment of the city and its transport network, whether they cycle or not, show their support.

Of the other Superhighways, CS5 Belgravia to New Cross is supposed to be finished by the end of 2015, and there may then be an extension east of New Cross. The plans for extensive segregation of the inner section, Belgravia to Oval, were consulted on this Summer, and look quite good. The outer section will use semi-segregation, we are told, but the exact character of this does not seem to have been decided.

CS1 City to Tottenham will not be on the roads originally planned, it will be on smaller roads, and possibly built by Autumn 2016. CS11 from Regents park to Brent Cross is also due to be finished by Autumn 2016. It depends on Westminster and the Royal Parks agreeing to the closure to through-traffic of the Outer Circle. It will thence run up Avenue Road, Finchley Road and Hendon Way, but we have see no plans for this so far.

CS4 Tower Bridge to Woolwich is supposed to be finished by 2017, and a new (so far un-numbered) Superhighway is planned on Lea Bridge Road in connection with the Waltham Forest mini-Holland project. CS9 which should have gone from Hyde Park to Hounslow has run into opposition from the Royal Borough of Kensington and Chelsea. It looks like TfL will only be able to progress the sections in Hammersmith & Fulham and Hounslow, and the timetable for these is currently unclear.

That's a total of twelve Superhighways, the number originally projected, though they are not all in the originally projected locations. The original CS12 Angel to Muswell Hill and CS10 Hyde Park to Park Royal have been abandoned. CS10 is supposedly replaced by the East-West route on the A40, but this means, with the original CS11 alignment having been moved east, from the A5 to the A41, that Brent, quite an inner borough (though technically an Outer London one) will have been completely left out of the Superhighways programme.

I have to say I take all TfL's projected completion dates with a massive bag of salt. We were told, after all, in late 2012, that CS5, 9, 11 and 12 would be launched in 2013. Well, clearly the rethink on the whole nature of the CSHs after LCC's Go Dutch Campaign and the appointment of Gilligan as Commissioner caused that three-year delay. But the longer timescale is for the best if what we get is actually good. The designs we are seeing now show a step-change in quality from what we were offered before. Problems tend to come at a few places at big junctions where there is slightly too much emphasis on mixing and sharing with pedestrians: we need separation and clarity to allow flows of both cyclists and pedestrians to continue to grow and co-exist in harmony. We need efficient cycle routes and we don't want pedestrians to get intimidated. But the basic battle for space and separation from heavy flows of traffic seems to have been won.

Central London Grid

The Grid is the name given to the combination of Superhighways and Quietways in Central London. We have a map of the Grid, and we have the Superhighway plans so far as they go, and we have solid proposals for some of the Camden routes, but that seems about all. We have little indication of the standard that the boroughs other than Camden will apply to the Quietway routes. We have had one Quietway proposal from Southwark (QW2) in detail, and this has been criticised in detail elsewhere, with suggestions for how it could be better. It seems likely to fail LCC's criteria of vehicle flows below 2,000 PCU per day and speeds under 20mph with the design that has been proposed. It seems that the problem is political will from the borough to cut the minor-road rat-runs (like Tabard Street, which is parallel to the A2 and should not be a through-route), and it looks very likely that this kind of issue with the Grid Quietways will be repeated more widely unless Boris Johnson and his aides can somehow bring more persuasion to bear on these boroughs.

Current Central London Grid plan
I've written about the inadequacy of many parts of the Grid plans before. The problem is basically one of the Mayor trying to promote changes on roads he doesn't control. One answer would have been for him to have included more TfL roads in the Grid. Kensington and Chelsea is most obviously not playing ball, and Westminster's commitments remains very vague, which is deeply worrying since, as can be seen, much the largest part of the Grid is in Westminster. The general lack of concrete plans by the boroughs for implementing the non-Superhighway elements of the Grid at the moment makes it look very likely that little of the Grid will have progressed beyond the paper stage by May 2016.

Quietways outside Central London

The Quietways beyond the Grid area are a separate funding stream for TfL, and this also is the only source of funds for new routes (or upgrades of old ones) for the boroughs that lack mini-Holland funding (that is, most of the outer boroughs). Sustrans was put in charge of doing the initial planning of these Quietways, and immediately there seemed to be divergences of opinion over what the scheme really was about. The emphasis in the Mayor's Vision for the Quietways was on 'low traffic back streets and other routes', but it also stated:
Where directness demands the Quietway briefly join a main road, full segregation and direct crossing points will be provided, wherever possible, on that stretch.

We will use judicious capital investment to overcome barriers (such as railway lines) which are often currently only crossed by extremely busy main roads. Subject to funding, land and planning issues, we will build new cycling and pedestrian bridges across such barriers to link up Quietway side-street routes.
This was always going to be a prescription that was hard to apply in many places in Outer London, where 'low-traffic back routes' are not very available or useful, and therefore the joining of main roads might not be so 'brief'. I pointed out last year how the level of funding allocated to these routes did not suggest that many intractable problems that require heavy engineering solutions, such as the mess of railway and main road corridors that makes the centre of the Borough of Brent quite impenetrable by bike, could actually be solved within the limits of this programme. It soon became clear that Sustrans and some people in the boroughs were interpreting the Quietways as being necessarily, and thus limitingly, on quiet roads, and being necessarily low-intervention, which is, of course, what the name does suggest. However, Andrew Gilligan had repeatedly said that where no satisfactory back-street route exists on the desired alignment, Quietways can be on main roads, and they can be high-intervention, i.e., physically segregated. This raises an unanswered question of how bad the backstreet route has to be before the backstreet idea is abandoned. The other question which remains unanswered is the same as for the Grid: how prepared will local councillors be to actually cut the rat-runs to make back-street routes attractive?

The planning for the Quietways, so far as it has got, seems to have been rather secretive, and LCC has only with difficulty managed to compile this plan, low-res version below, of roughly where the first routes are currently proposed to go.


It appears that this map shows the very most that will be achieved by May 2016. It will be seen that Andrew Gilligan's early concept of naming routes after tube lines that they follow has been abandoned, except for the Jubilee Line Quietway. This one seems a poor shadow of what he promised last year, when he spoke of a route from Central London to Wembley. Here is is shown stopping short of the North Circular, at Dollis Hill. The fact that there is a serious intention to extend it beyond the North Circular is indicated by an announcement of funding for a new cycling bridge over the A406 in Brent (and also another in Redbridge), but the timescale for these larger Quietway interventions seems to be beyond this mayoral term.

The Jubilee Line route, like CS11, depends at its southern end on the Royal Parks and Westminster agreeing to the closure of Regents Park to through-traffic. Through Camden the route, oddly, is only one or two blocks away from CS11, and then it follows an old LCN route in Brent, which requires more mode-filters and reversal of priority at junctions with other minor roads if it is to be made much more attractive than it is now. There's no guarantee of local councillors agreeing to measures like this, and little the Mayor can do to make them. So the worry is about standards. It's all very well to draw these lines on maps, but if the routes are fiddly to use, and traffic levels remain as they are at the moment, and on many roads, such as Maygrove Road and Chapter Road on the Jubilee route, cyclists just get squashed into tightly-parked narrow corridors with cars trying to get past them, then the Superhighways will prove far more attractive to all cyclists, of whatever level of experience, than the Quietways, which were supposed to be the routes 'particularly suited to new cyclists'.

Chapter Road, Brent, as it is at the moment, part of the the proposed Jubilee Line Quietway.
Perhaps the most serious problem for the inner Jubilee Line route occurs where it meets West End Lane, West Hampstead, which it has to follow for a short while to connect between side-streets, because there is no other way to cross three railways. Traffic on this road is far above a 'quietway' level, but there is also no space for segregated lanes, and no realistic political prospect of closing this quite important local through-route to motor vehicles. Sustrans' proposal for this location has been a fanciful 'shared space' repaving, rejected by Camden Cyclists, rightly, as quite beside the point. This situation points to a fairly deep conceptual problem with the Quietways. Andrew Gilligan wrote in the Mayor's Vision that the Quietways would exploit London's 'matchless network of side streets, greenways and parks'. Where are the links in this network, exactly, and how should conflict be resolved at places like West End Lane?

Again, the most advanced of the Quietway plans seems to be CS2 in Southwark and Greenwich, which Gilligan has indicated will be delivered by 2016 subject to planning permission for a new path along the railway past Millwall Football ground. Bits like this could prove to be good and could justify the name 'Quietway", but examination of the map above will show that, in general, Sustrans have not succeeded in identifying the apocryphal 'matchless network of side streets, greenways and parks', because, of course, it is not a continuous network, and could never be made into one within the constraints of the funding offered, not to mention the realities of local politics. The concept is not entirely without merit: it is not that different to the orbital Green Routes plan of Copenhagen that I covered in my blogpost on that city. The political climate there, however, is sufficiently different, through cycle culture being sufficiently established, that the complete removal of traffic, parked and moving, from minor streets, and their conversion to genuinely green pathways does really occur. It is hard to see that happening immediately in many places in the London suburbs.

On a pessimistic assessment, it looks like the Quietways could become just a third attempt at the London Cycle Network (following Ken Livingstone's failed LCN+ project), on very similar routes: a byword for complex, inefficient, out-of-the-way routes that most cyclists will avoid and which will not significantly encourage cycling in Outer London, where encouragement is most desperately needed. What I would really have liked to have seen would have been a far better-funded equivalent of the Superhighways project specifically targeted on strategic main road sections in Outer London that would often be orbital, not radial routes. There are one or two projects coming from the boroughs that do approximate to this: there is currently a consultation out from Hounslow on possible cycle tracks on Boston Manor Road, the A3002, with proposals that look really rather good. I think this kind of thing, solving specific outer borough link problems, is likely to prove a more effective expenditure of funds than the very distributed low level of funding not achieving consistent high quality that is possibly emerging as the pattern for the Outer London Quietways.

Mini-Hollands

Three mini-Hollands were selected this spring: Enfield, Kingston and Waltham Forest. The following description is taken directly from the TfL site:
Kingston
A major cycle hub will be created and the plaza outside Kingston station will be transformed. New high-quality cycling routes will be introduced together with a Thames Riverside Boardway - a landmark project which could see a new cycle boardwalk delivered on the banks of the river. 
Enfield
The town centre will be completely redesigned with segregated superhighways linking destinations, three cycle hubs delivered across the Borough and new greenway routes introduced. 
Waltham Forest
A semi-segregated Superhighway route along Lea BridEnfge Road will be developed as well as a range of measures focused on improving cycling in residential areas and creating cycle friendly, low-traffic neighbourhoods.
These are funded to the tune of £30 million each. The Enfield project seems to have proved most locally controversial, with shopkeepers mobilising against it, and the Enfield Cyclists organising a counter-campaign of demonstratively spending money in shops to try to prove the power of the 'pedal pound'.
The most actual action so far has been seen in Walthamstow, where a series of temporary experimental road closures were put in and then taken out again. This is like the '20 bollards' game, where you have only twenty bollards to distribute around your town, and you need to position them to most effectively reduce rat-running traffic to create useful new cycling and walking routes and enhance local life. Again, reaction has been mixed, but there seems a lot of positivity around the Waltham Forest mini-Holland, and campaigners seem to think it has a good chance of being accepted by the community, and forming a good template for other Outer London town centres in the longer term. But broadly, because the selection process took so long, not enough has actually happened in the mini-Hollands yet to write much about them. 

The selection procedure itself, the holding of the competition, was I think one of Andrew Gilligan's aims, successfully completed. It did get some previously pretty cycle agnostic, or even hostile, local authorities to start seriously thinking about radical change to kick-start more cycling in Outer London, lured by the cash promise, and the fact that the subject seemed to be suddenly in fashion, and that this was the project of a Tory mayor, potentially outflanking the Left on a 'green' issue. It remains to be seen whether anything from these unsuccessful mini-Holland bid plans will see the light of day; Gilligan has promised in letters to the boroughs that some projects will be pursued, and has budgeted for a number of mini-Holland 'consolation prizes' to finance the best ideas that came out of the competition in the non-winning boroughs, including the two new bridges across the North Circular I have already mentioned. Implementation of these however seems to be beyond 2016.

Conclusion

How to summarise? It has been difficult writing this post. I have started several times, and had to rewrite because of new developments and announcements. The Mayor's project is now gathering pace. A couple of months ago I would have made a much more negative, perhaps slightly bitter, assessment of where it had got to, compared to the promises of the Vision document. But now we have seen more of the new Superhighway designs, we can see that our campaigning over the last four years or so has been a success: it has produced a mind-shift in the ambitions of the people tasked with designing cycle facilities in London. The mind-shift of course has not spread to many local politicians, who have direct control over most of our roads, and therein lies the rub. There is plenty more campaigning that needs to be done, in fact, there will never be an end to it, as David Hembrow points out from the example of the apparently miraculous Netherlands. LCC had exactly the right idea with its Space for Cycling Campaign for the local elections: taking very specific demands for each ward right to each local ward councillor and candidate. This did have an effect, rather like the mini-Holland competition process, of making a few more people think properly about the issues, or at least start listening to the arguments, for the first time, though I don't expect miraculous results from it of all the ward 'asks' actually being delivered in the next few years. It was a stage in a process.

London's cycling revolution will certainly spread from the centre outwards, and the Superhighways will carry it to the suburbs. In the foreseeable future it will remain quite limited, though. The target of 5% mode share by 2025 might well be achieved, but this would still leave most Londoners out from the benefits that cycling can provide, which is rather sad, and it will also limit the success of the city overall. We've see a tremendous reaction from business leaders to the Superhighway proposals, and it's been found that a vast majority of ordinary Londoners support them as well. I always expected this kind of reaction to visionary, transformative proposals for our streets; I have said repeatedly in this blog that this is what would happen if you put to people a striking, coherent vision for change. I said this was why we in the cycling world should stop messing around asking for scraps that nobody really could see the point of, and should start to think far bigger, about what a real cycling and linked quality of life revolution would look like in London. There is now a growing realisation that London needs to compete with other world cities in terms of the quality of life it offers to a highly mobile skilled workforce. Competing on salaries or low levels or either personal or corporation tax is not enough. It is this economic driver that is increasingly recognised, and will increasingly be recognised, as the impetus for change.

This should encourage Boris Johnson and his aides and officials to become even more bold in laying down the infrastructural basis for the cycling revolution before he leaves office. We need all the other Superhighway plans quickly, and we need top quality maintained at the difficult places with many competing demands. We need better control and more up-front leadership over the Central London Grid and the Outer London Quietways to prevent any money being wasted on cosmetic projects which fall short of the best standards. We need the Royal Parks Agency, the Corporation of London, the City of Westminster and Royal Borough of Kensington and Chelsea to come unambiguously on board and we need to find ways to put pressure on the from every angle, from residents, businesses and commuters, to do so. We need flexibility over the definitions of the various projects, so it is clear to all that we can have segregated tracks funded on long stretches of main road in Outer London, and this in fact becomes a thing that is expected. We need the major essential linking infrastructural elements such as the new North Circular crossings delivered more quickly. We need more funding for Outer London and plans for a second round of mini-Hollands after 2016 to start to develop a real usable cycling grid outside the centre. Finally, the Mayor and GLA need to get a grip on miscellaneous 'third-party' development projects, such as, in my part of London, Brent cross Cricklewood, and Old Oak Common, and ensure that everything built in them meets the Cycling Level of Service  in the London Cycle Design Standards. There should be no question of more major road junctions being rebuilt in London without high-quality cycle provision.

There is progress, but the gap between London and the best places for cycling in world continues to grow. We continue to lose further generations of children to cycling. We continue to see illegal levels of pollution in our city, and massive levels of pollution-related disease. We need to be sober. Cycling appears quite popular at certain places and certain times in London, but we're really still in the remedial class of world cities for cycling. Cycling still hasn't made the breakthrough to become the obvious method for most people to consider for short, routine journeys. Our roads still feel, and, are, far too dangerous. We need to continue to demand far more. We can't let up.