Showing posts with label Southwark. Show all posts
Showing posts with label Southwark. Show all posts

Friday, 20 November 2015

A tour of London's emerging cycle network

This Sunday I will be leading a pre-emptive tour of some of the most promising cycle infrastructure currently under development in London. It's pre-emptive because much of it is not yet finished. Therefore it won't be as particularly pleasant ride because in parts we will have to cycle outside not-yet-open cycle lanes tussling with the motor traffic. However, I think it is worth seeing what is going on and assessing it at this stage. Some of the infrastructure is open and can already be enjoyed.

There are three start points, starting from near my house and working in though Brent. They are:

11:00 am Kingsbury tube station
11:45 am Gladstone Park railway bridge (at the south end of Parkside NW2)
12:05 pm Queens Park Station car park

If you'd like to join somewhere else on the route described below, tell me and I'll see if it can be arranged.

Under-construction segregated cycle tracks. Larger map here.
This map shows approximately (not exactly) the recently-completed and under construction segregated cycle tracks in London. It also shows the location of Brent's not-yet-approved Carlton Vale scheme. This was the starting concept for planning the ride, to take in as many of these locations as possible. (But starting from the north-west suburbs, it proved necessary to leave out Cycle Superhighway 3 and the east part of the East-West Superhighway).

There's no infrastructure to speak of on the ride before reaching Queens Park, though just past Gladstone Park a pile of stuff is encountered in Park Avenue North, which I suspect is the first sign of construction of Quietway 3 in Brent.


Quietway 3 will run from Regent's Park to Gladstone Park in its first phase, with hopefully an extension across the north Circular towards Wembley and Harrow later (though that will be in the lap of the next Mayor).

Near the final pick-up point at Queens Park Station we will pause to have a look at the Brent section of Carlton Vale, with a copy of the plans for semi-segregated cycle tracks that I have in my possession. These have not yet been put to public consultation, so this is a good stage to feed suggestions for improvement back to the Brent Council.

The next objective of the ride is to look at the location of the future East-West Superhighway in Hyde Park. Unfortunately to get there is to try to pass through a terribly bike-impermeably part of London, through the need to cross the Westway, Grand Union Canal and Paddington railway corridor. There is no legal way through here north-south for cyclists between Royal Oak (Lord Hill's Bridge) and the Edgware Road, both of which are most unpleasant roads – a gap of 1km. If the East West Superhighway is extended to the A40, as planned, and if Westminster build their Quietway network, this barrier might one day be surmounted. But it is not clear to me how it will be, or if the planners of the grid have realised what problem this is.

The best that we can do on Sunday is to get off and walk. After passing through the pedestrain-only underpass at Porteus Road, we reach the newpedestrain-only bridge across the Grand Union Canal at the Paddington Central development.


That such a poor piece of pedestrian infrastructure was created so recently in such an important place is quite shocking. Forget about not being bale to cycle across it: how could a wheelchair user negotiate a corner like this?


Proceeding via the pedestrain-only waterside and primitively-cobbled path leading to London Road by Paddington Station, we will cycle to Hyde Park. There we see signs of action.



The E-W superhighway will go via the West and South Carriage Drives, which we will follow. This routing is clearly intended to take pressure off the shared (separated) paths Rotten Row and Broad Walk, though I doubt how successful this strategy will be, as Broad Walk and North Carriage Drive will represent a shorter route. We will then follow an old London Cycle Network route, sadly under-engineered, which was originally known as the Ambassadors' Route when created in the early 1980s (it features prominently in this film). This takes us to Pimloco where we can discover what has been built of the north end of Cycle Superhighway 5 in Vauxhall Bridge Road. This is where things start to get impressive.


This sets the pattern for what we will see on the rest of the ride. Here we have a 4m wide two-way cycle track separated by low kerbs from both pavement and road, clearly set-out. We'll be able to observe how, for example, the pedestrian crossings like this one work. This continues to the crossing of the Thames at Vauxhall Bridge.


On the south side of the river the passageway is clear and safe, though not always so wide, through the previously-notorious Vauxhall Gyratory system and under the railway into Waterloo. Segregation continues at the standard shown above to Kennington Oval, whereafter CS 5 reverts to the old-style painted blue blobs. We, however, will turn left to join CS 7 on Kennington Park Road. This is not particularly impressive until one gets near Elephant and Castle, where what appears to be a temporary arrangement takes us, very clearly signposted, through a churchyard and via some minor streets, on to the new CS 6 on St George's Road (previously know as the North-South Superhighway).


Though this is not on the most direct route between Elephant and Castle and Blackfriars Road, the cycle track is again impressively implemented. It leads into similar engineering still being built on the west side of Blackfriars Road, via a signalised crossing of the St George's Circus roundabout. We will be able to judge the efficiency of these junctions for cyclists. My impression was that they are good. By this stage in the ride we have already seen probably more of the low-level cycle signals than has anybody else in the UK. These fantastically sensible features have only just been approved for use, and Transport for London are rolling them out on these tracks.


The track is not yet constructed on Blackfriars Bridge or the slip road off it, but we can see where it will be. The Thames was looking quite choppy when I took these photos on Wednesday.


We will then find, I hope, that we can then cycle a substantial section of the Embankment Superhighway going westwards that is not yet officially open. Here are the works between Blackfriars and Waterloo Bridges.


And here is the section already in use, approaching Westminster Bridge, with the wide segregating island designed so that coach parties can congregate on it without spilling into the track, and chamfered kerb to minimise the chance of pedal-strike. This has already become an 'iconic' view of London, to those of us of a kerb-nerd disposition.


Parliament Square is as awful as always; work on the cycle crossings here has not yet started. We will head up now through the West End, as best we can, showing where is another of the serious gaps in the infrastructure that is in the City of Westminster's court to solve. Charing Cross Road is a disaster-area that desperately needs complete re-planning including Space for Cycling, or most of the traffic removed. It is a disaster equally for those on bikes as those stuck in the permanent queues in buses and taxis. It just doesn't work as it is.


We reach more civilised territory as soon as we cross the border into Camden. The Borough of Camden deserves huge credit for, over the last twenty years, rationally re-planning and upgrading its traffic network, particularly in the south of the borough, with an emphasis on removing unnecessary traffic from residential (and some business) neighbourhoods, and facilitating cycling. I have covered the history of Camden's cycle network extensively on this blog. Particularly deserving of credit is the Camden Cabinet Member for the Environment, their roads supremo, Councillor Phil Jones, who has lead a serious expansion of the segregated cycle network in the borough (which was already the only one deserving the name in London), using the money made available by Transport for London under  Mayor Boris Johnson's cycling programme, and, particularly, has bitten the bullet and ordered the doubling of capacity of the east-west segregated cycle link through Bloomsbury (the old London Cycle Network route 0, or the Seven Stations link), so brining to the originally-intended standard the link planned and lobbied for by Paul Gannon, Paul Gasson, myself, and other members of Camden Cycling Campaign in the early 2000s. I need also to mention that the current members of CCC have campaigned energetically for this outcome.

We will see on our ride how this work is progressing. The original two-way cycle track on the north side of the road is being converted to a one-way track eastbound within the same width, and a new westbound track is being constructed using semi-segregating Orcas (already used in Waltham Forest and planned for use on Carlton Vale in Brent). Hence the cycle capacity of this incredibly popular link is being doubled, through a whole lane of motor traffic being removed and the whole of the corridor being converted to one-way operation for motor traffic. Moreover, the motor flows are being opposed on opposite sides of Gower Street, so removing the corridor as a rat-run alternative to Euston Road entirely. This is exactly how the Dutch so frequently use one-way working for motors in dense city centres to eliminate through traffic, and it is great to see a London borough applying this concept. The reduction in traffic on the corridor and simplification of the whole system should remove the junction problems that have existed on this route in its previous layout. The separation of the eastbound and westbound flows of cyclists will remove the risk of cycle-cycle collisions in the old confined space. Pedestrian facilities are being improved as well. It's a win all round.


There is a major backlash (mostly from the black cab lobby) against the scheme already and it is important that Camden Council recieves lots of support for the scheme. As Camden Cyclists state on their website,
If you like the scheme when you have tried it, tweet about it with #taviplace or send an e-mail to Camden Council: torringtontavistocktrial@camden.gov.uk to help ensure that the supporting voices outweigh those of the objectors – who will undoubtedly be many. ‘Winning the peace’ also entails all who use the new scheme riding legally and courteously so as to maintain the respect of local residents.

Not everything Camden has done for cyclists in recent years has been quite so clever. After experiencing this (unfinished) project we head up to Kings Cross and St Pancras, and one curious thing we experience is the Pancras Road tunnel under the railway (below) where the cycle lane is the bit bewtween the solid white line and the segregating island, coming into collision with the left-turning stream of traffic. The bit between the segregating island and the pavement is... wait for it... a taxi lane! And the taxi drivers have the nerve to be ungrateful to Camden now over Tavistock Place!


In the northern part of Pancras Road Camden are doing better, with new stepped cycle tracks, which we will also experience, before finding our way to the northbound Royal College Street cycle track, which has had some subtle improvements since I last posted about it when first it opened. We will then follow the route along Pratt Street and Delancey Street that will be going ahead for upgrade to two-way cycling in the next phase of Camden's Cycle Grid programme. From there the old LCN route on Gloucester Avenue and King Henry's Road takes us towards Swiss Cottage (this notorious gyratory also programmed to be reformed for the construction of CS 11 up the Finchley Road next year), and thence back towards the ride's starting points in Brent.

I think the ride will give a good overview of how a proper cycle network for London is now starting to emerge, after many years of hard campaigning for it by a great many people. For me, as I explained recently in a long, personal post, the story began in the late 1990s with the campaign in Camden for the original Royal College Street segregated cycle track (now replaced), a pioneering feature in London then, and then the campaign for the Seven Stations Link. These pieces of infrastructure I believe established and demonstrated in London for the first time the principles that we are now seeing rolled out on a much larger scale in the new Superhighways. Boris Johnson recently commented in the London Assembly that 'Virtually every cabinet member has ticked me off for the Cycle Superhighways', and I think this shows what a fundamentally unpopular course in the British political culture he has chosen to follow here, and how much credit he deserves for doing something really rather good, that will undoubtedly be the major legacy of his mayoralty. Also deserving of credit is his Cycling commissioner, Andrew Gilligan, for pushing recalcitrant officials and recalcitrant boroughs into action on the Mayor's cycling programme. When he was appointed in 2013, many wondered if, as a journalist,  if he was appropriately-qualified for the job, but I commented at the time that his skills as a propagandist might just be those most needed in the role, and I think I was right.

It's a fragile legacy. The next mayor has it in his or her power to get on with the programmes, fill in the worst gaps (for example north-south across the West End), connect up all the segregated Superhighways, extend them into all the outer boroughs, build more mini-Hollands like the successful Walthamstow one, break the major barriers in Outer London like the North Circular, and enhance the quality of the Quietways. Or he or she has it in their power to effectively abort the programme and leave the lovely pieces of engineering that we are now seeing in their glistening newness as sad stubs and monuments to what might have been, a transport revolution never delivered. As Cyclists in the City has recently commented, though the Green and Liberal Democrat candidates for Mayor in 2016 (who are not likely to win) seem highly committed to continuing the cycling programme, the commitment of the Conservative and Labour candidates, Zac Goldsmith and Sadiq Kahn respectively, is really not very clear from what either of them has said so far. It's going to be another close race for Mayor in 2016, and the vote of cyclists is going to make a difference. I invite the two of them to commit clearly now to completing the current programmes and thereafter to further major expansion of high-quality cycling infrastructure, maintaining at least the current level of expenditure on cycling in London.

In the shorter term, I invite you, if you can make it, to my tour of London's developing cycle network on Sunday.

Tuesday, 18 October 2011

On Southwark Bridge, for a change

This is a sort of postscript to my last piece, on the third Blackfriars Bridge flashride. After the flashride, some of us went to the bar above the Young Vic, to discuss Danish versus Dutch cycle engineering and such fascinating topics, and after that, I needed to find my way back to Blackfriars Station. Not having a clue about the roads of London south of the Thames, particularly the SE quarter (did you know, by the way, that there used to be S and and NE London postcodes as well?), and not inclined to consult maps and iPad, both of which I was carrying, I got lost, and, happening upon Cycle Superhighway 7, decided to follow it to the City, which I had never done before. This took me across Southwark Bridge, which I had not cycled across in recent times. I was impressed, and those who read this blog regularly will know that I am not often impressed by London cycle infrastructure.

Southwark Bridge, photo by Alan P
For Southwark Bridge now has concrete kerb-segregated cycle tracks on both sides painted Superhighway blue. These have narrowed the carriageway to one not very wide motor lane in both directions, which should limit motor speeds. The pavements have, I guess, not been altered from how they always were, and are generous.

This all looks very progressive to me, almost "Dutch". Now a little bit of searching of photos on Flickr has shown me that the concrete segregation was in place before the blue CS7 markings were put down, so I don't actually know when the segregation was done and if it was part of  the Superhighway plan. Certainly in 2004 all Southwark Bridge had was very narrow painted advisory bike lanes, with two motor lanes northbound and one southbound. This image suggests the segregation might have been built in 2007, well before the Superhighways programme started.

Discussion of this subject on A Grim North has suggested that the segregation was not put in primarily to benefit cyclists, but to reduce the capacity of the bridge to lengthen its life. This does not seem to make too much sense, as the bridge previously had a reputation as "the car park bridge" as, according to Wikipedia, coaches used to park there. This parking was presumably in the inside northbound lane, and on top of the advisory cycle lane, reducing the bridge to two lanes: all the old photos I have seen show double-yellow lines in the southbound lane. If the parking was evenings only, and the bridge really operated as three lanes during the day, then, yes, the segregated cycle tracks could have reduced its capacity during the day. So this would be a case of, as so often, the best cycle facilities in the UK coming about accidentally, for reasons other than the desire to create good cycle facilities, as with the Cambridge Guided Busway.

In this case, it does not matter. The result has been to create the best crossing of the Thames for London cyclists, and it made sense to direct CS7 this way. At the north end of the bridge Queen Street is closed, and motor traffic has to turn right or left onto Upper Thames Street, as shown below. Cyclists on CS7 thus have a clear run into a largely traffic-free Queen Street, and then King Street, via another bollarded road-closure, right up to Gresham Street, in the heart of the City: altogether one of the best bits of cycle route in London. This is very much a Dutch city-centre pattern of combining segregation, in places where there is no sensible alternative, with strategic closures of other streets to motor vehicles (sometimes termed filtered permeability for cyclists), or use of one-way street networks, with cycle exceptions, to provide almost traffic-free cycling on the remainer of a route.

Looking from Southwark Bridge towards Queen Street, photo by Alan P
Now again, none of this really came about through strategic planning for cycling. The closure of Queen Street to motor vehicles was part of the Ring of Steel response in the City to Irish republican terrorist attacks in the early 1990s. Again, the best stuff for cyclists in the UK was not done specifically for them. But the combination of this and the segregation of Southwark Bridge did make this the best route for CS7, though, foolishly, the superhighway officially stops at this junction, and the blue lanes do not continue into Queen Street. For this combination of reasons, this is the best-implemented and most attractive part of Boris Johnson's sorry, rather less than half-hearted, Cycle Superhighway project.

In further discussion on A Grim North, it is commented that the segregation on the bridge is poor, with high, unforgiving kerbs, and the tracks too narrow to allow overtaking of slower cyclists. I would say that it would be possible to overtake another cyclist on these tracks, particularly if you rung your bell and got them to move in as far as possible, but it is certainly true that the kerbs could have been done better. Here is a new cycle track in Assen, which I photographed on the Cycling Embassy of Great Britain study tour in the Netherlands in September. I have referred to this one before: it is the secondary cycle track, for the benefit of which Assen moved the canal two metres sideways. Being new, I take it to represent the state-of-the-art of Dutch design. You do see slightly different designs all over the Netherlands.

Track along the south side of the Vaart canal, Assen
The fact that this is a two-way track is not relevant here. The outer kerb is in fact fairly high, and vertical, but the inner one is low and chamfered, allowing a possible run-over on to the pavement. This, incidentally, also makes the track usefully permeable to disabled buggies and the like. Accommodating the needs of the disabled is a significant, and generally overlooked, purpose of Dutch cycle infrastructure. Clearly this is not a very similar environment to central London; nevertheless, lessons can be learned. Note the shiny new lifting bridge on the canal in the background. The Dutch are always building bridges. There are loads of bridges across the canals of Assen, and all of them have cycle provision. Either they are cycle-only bridges, or they have cycle lanes or tracks. And you never get parking on Dutch bridges. The Dutch have twigged that space on bridges is too precious to devote to parking.

Despite the general wateriness of the Netherlands, crossing water on bikes there is now never a problem. It has been a problem in the not-so-distant past: here is Mark Wagenbuur's intersting video on the history of the Berlagebrug in Amsterdam. In 1984 Dutch cyclists had to fight for cycle provision on this bridge. They won.



One thing that comes up repeatedly in discussions of Dutch cycle infrastructure by British cyclists is that they don't understand how very new it is. This means that those who last visited the Netherlands perhaps 20 or 30 years ago really don't have much relevant knowledge (another reason to suggest they go on a study tour). Virtually all Dutch cycle infrastructure has been replaced, or radically improved, in the last 30 years, and David Hembrow suggests that most Dutch cycling is now done on infrastructure that is less than 15 years old.  The Berlagebrug incident was perhaps a turning point from which the modern Dutch infrastructure-driven cycling renaissance can be dated. The incident also shows that this renaissance, in its early days in the 1980s, was far from secure. The Berlagebrug didn't recieve cycle lanes until 1982, but they were threatened by a change in political fashion only two years later. The cyclists in Amsterdam stood up to that threat. This is a salutary lesson to the cyclists of London today: it shows how similar our situation is with Blackfriars Bridge now.

It may be that TfL don't think good cycle provision on Blackfriars Bridge is necessary, because they have done CS7 and Southwark Bridge. This is a mistake, because cyclists need a dense grid of safe routes if mass cycling is to come about: this was a vital lesson the Dutch learned in the 1980s. It doesn't all need to be kerb-segregated (Berlagebrug is not), but it does all need to join up properly, cycle space needs to be uninterrupted by parking and taxi and bus stopping, and all the junctions need to be safe, all factors conspicuously factor lacking at Blackfriars and throughout London. There are few enough Thames crossings as it is, and none dedicated to bikes. Boris Johnson could have spent £60 million on a cycle bridge across the Thames, but he chose to spend it on a ridiculous cable-car project instead. The city of Amsterdam injected a fair amount into the London economy by getting London architects to design the magnificent Nescio Bridge across the Amsterdam-Rhine canal, possibly the longest dedicated cycle bridge in the world (which, surprisingly, only cost £6.5 million in 2005 – how do they do huge infrastructure so cheap when it seems to cost us thousands to put in a few cycle stands?). It's a pity that our talented people are not able to exercise their design abilities on cycle bridges for our city, which so pointedly needs them – and not just across the Thames, but also across the Rivers Lea, Brent, and many rail and motorway corridor barriers.

But I wish to end on a positive note. Cycle Superhighway 7 at the City end is a little blue oasis in the general cycling inferno that is London. It is a start. It gives a glimpse of what we could do and what we could get. The key elements are there: dedicated, uninterruptible space for cycling, sensible junction and signal design*, and integration with de-trafficked streets. We need to keep pressing at all levels of government pointing out the good examples like this, showing how removal of motor vehicle space and motor through-routes have improved, not impoverished, the city where they have been implemented, and explaining that the Cycling Revolution requires this sort of streetscape to become the norm, not the exception, and that this would be good for all Londoners. The odd historical reasons we have got here notwithstanding, we have here a start.

*Post-script: OK, in my desire to end on a positive note, I was too positive here. As Cyclists in the City points out today, the junction at the north end of Southwark Bridge is a nightmare at busy times (compare the picture he has used with the one I used). Though not as bad as what is proposed for Blackfriars, it is still poorly designed, with masses of blue paint, but vehicles still allowed and encouraged into the left hand-lane, allowing no space for cyclists.